Maintenance Schedule - NTC RZ113 Operation Manual

Asphalt and concrete cutters
Table of Contents

Advertisement

Asphalt and concrete cutters

6. MAINTENANCE SCHEDULE

This maintenance schedule contains only the most important operations. Besides of these operations, carry out maintenance and repairs of the machine
as necessary depending on the respective conditions of operation. Check also the engine operation manual.
WARNING:
Turn off the engine before any maintenance or repair activity.
Use genuine spare parts only. Use of non-original spare parts may lead to damage to the machine. The manufacturer will not honor any
warranty claim arising from such reason.
Item
Operation
Engine oil
Inspection of oil level
Exchange
Air filter
Inspection
Cleaning
Spark plug (gasoline
Inspection - cleaning
engines)
Cyclone filter
Cleanig
Filter bowl
Cleaning
Fuel hose
Inspection - Exchange
Valve clearance
Inspection - adjustment
Fuel tank and strainer
Cleaning
Drive belt
Tensioning
1.
To be carried more often when operating in dusty environment!!!
2.
Such maintenance should be performed by service technicians NTC, respectively. authorized service according to engine type, especially
if the user does not have the proper tools and knowledge about these devices.
3.
In case the engine is equipped by cyclone filter.
Page 18
Operation manual
Initial inspection
After 1st month or 20
hrs.
 (1)
Every 12 months or 250 hrs. (2)
Every 12 months or 300 hrs. (2)
issued 01/2017
Every 3 months or 50
hrs.
DAILY
 (3)
Every two years
Every 6 months or
100 hrs.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rz123

Table of Contents