FIG.A
FIG.B
FIG.C
19-008
www.powercommander.com
1
Remove the side panels from each side of the ATV.
2
Prop the front rack open.
3
Remove both access covers shown in Fig. A.
4
Install the PCV to the side of the ECU (Fig. B).
Use the supplied velcro to mount the PCV. Make sure to use the supplied alcohol
swab to clean both surfaces.
5
Locate the stock Throttle Position Connector on the right hand side of the
throttle bodies. This is a white 3 pin connector (Fig. C).
6
Unplug this connector.
2009-2010 Polaris 800 PCV - 3
Need help?
Do you have a question about the POWER COMMANDER V and is the answer not in the manual?