Husqvarna DXR250 Operator's Manual page 51

Demolition robots
Hide thumbs Also See for DXR250:
Table of Contents

Advertisement

Visual check of mountings (Re-tighten if neccessary)
Bolts and fasteners
Fasteners dozer blade cylinders/outrigger cylinders
Fasteners boom system and Tool Hitch
Visual check of wear and damage
Hydraulic cylinder: Barrel, rod and rod wiper
Hydraulic hoses
Power cable, connectors and sockets
Rubber/steel components: outrigger foot and track
Check of leakage
Cylinders
Visible hoses
Valve blocks
Cooler
Slew and drive motor
Function check
Hydraulic cylinders, slew and drive motor/s (smoothness)
Track tension
Emergency stop machine
Machine stop remote control
Level check
Hydraulic oil
Breaker lubrication
After the first 50 hours
Carry out the weekly service as per the service schedule before you perform the 50 hours service.
Lubrication
Cylinders and shafts in Boom-Stick and Tool Hitch
Dozer blade cylinders/Outrigger cylinders and shafts
Slewing ring: nipples and ring teeth
Change
Gearbox drive motor oil
Gearbox slew motor oil
MAINTENANCE AND SERVICE
English – 51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxr270Dxr310Dxr300Dxr140

Table of Contents