Page 1
No.288 Shizhu Road, Tonglu Economic Development Zone, distribution of it in any form or by any means. All rights reserved. SolaX Power Co.,Ltd,.reserves Tonglu City, Zhejiang Province, China.
Contents Contents Copyright Declaration The copyright of this manual belongs to SolaX Power Co.,Ltd..Any corporation or 1 Note on this Manual individual should not plagiarize,partially copy or fully copy it(including software,etc.), and no reproduction or distribution of it in any form or by any means.All rights reserved.
6.6 Meter Connection 6.7 LAN Connection 1.1 Scope of Validity 6.8 DRM Connection This manual is an integral part of X3-Hybrid, It describes the assembly, installation, commissioning, maintenance and failure of the product. Please read it carefully 6.9 WiFi Connection(optional) before operating.
Safety Safety 2 Safety WARNING! Do not operate the inverter when the device is running. 2.1 Important Safety Instructions WARNING! Danger! Risk of electric shock! Danger to life due to high voltages in the inverter! All work must be carried out by qualified electrician. The appliance is not to be used by children or persons with reduced physical sensory or mental capabilities, or lack of Prior to the application, please read this section carefully to ensure correct and...
Page 5
Islanding effect is a special phenomenon that grid-connected PV system still supply power to the nearby grid when the voltage loss is happened in the power system. It is dangerous for maintenance personnel and the public. X3-Hybrid seires inverter provide Active Frequency Drift(AFD) to prevent islanding effect.
Safety Safety 2.2 Explanation of Symbols The inverter can not be disposed together with the household waste. This section gives an explanation of all the symbols shown on the inverter and Disposal information can be found in the enclosed documentation. on the type label.
(applies to wiring rules AS/NZS_3000:2012 for Australia and New Zealand) 3.1 Basic Features X3-Hybrid Seires is a high-quality inverter which can convert solar energy to AC the cable is not energy and store energy into battery.
Introduction Introduction 3.2 Work Modes X3-Hybrid Series inverter provides multiple work modes based on different requirements. Work modes: Force time use 3.3 Dimension Priority:battery>load>grid (when charging) Priority:load>battery>grid (when discharging) This mode applies the area that has electricity 457 mm 228 mm price between peak and valley.
The packing list shown as below. 5.3 Mounting Installation Precaution X3-Hybrid Series inverter is designed for outdoor installation (IP 65). Make sure the installation site meets the following conditions: Not in direct sunlight. Not in areas where highly flammable materials are stored.
Page 12
Installation Installation Ø Space Requirement 369 mm 300mm 300mm 300mm 500mm Step 1 300mm Ø Mounting Steps Tools required for installation. Installation tools : crimping pliers for binding post and RJ 45, screwdriver, Step 2 manual wrench and Step 1: Screw the wall bracket on the wall 1.1 Place the bracket on the wall and mark down the position of the 6 holes.
1.2 Check the PV+ and PV- from the PV string combiner box correctly. 1.3 Please make sure the impedance bewteen the positive pole and negative pole of PV to earth X3-Hybrid can be connected with PV modules in series with 2 MPPTS for should be MΩ level.
Electrical Connection 6.2 Grid Connection Step2. X3-Hybrid series inverter are designed for three phase grid. Voltage is 380/400V, frequency is 50/60Hz. Other technical requests should comply with the requirement of the local public grid. Table 4 Cable and Micro-breaker recommended X3-Hybrid-5.0-D...
E Version For Other Countries X3-Hybrid series inverter has On and Off grid function, the inverter will deliver output power through AC port when the grid is on, and it will deliver output power through EPS port when the the grid is off.
The battery communication can only work when the battery BMS is compatible with the inverter. Charging & discharging system of X3-Hybrid series inverter is designed for high-voltage lithium battery. Before choosing battery, please note the maximum voltage of battery can not Ø...
Electrical Connection Electrical Connection Ø Communication Connection Steps: 6.5 Earth Connection(mandatory) Step1. Disassemble the GEN/Meter/BMS cable gland. User can addtionally earth the inverter to the enclosure of a second earthing or equipotential bonding if it is required by local safety. This prevents electric shock Step2.
Electrical Connection Electrical Connection Ø Meter Connection Steps: 6.6 Meter Connection Please kindly noted the PIN definition and port position. Meter is used for monitoring the power usage for entire house, at the meantime, inverter will also need the data from Meter to achieve the Export Control Function. Step1. Prepare a connector and two communication wires. Note! Step2. Unscrew the nut of Meter connector and insert two communication It is necessary to connect meter to inverter otherwise inverter will wires through it.
Electrical Connection Electrical Connection 6.7 LAN Connection 6.8 DRM Connection LAN communication is the standard communication interface. It can transmit the DRM is provided to support several demand response modes by emitting control data between the router and inverter via the local network. signals as below.
6.10 RF Connection(optional) Inverter provides a WiFi port which can collect data from inverter and transmit it to X3-Hybrid inverter provides a RF( radio frequency) interface which control the monitoring-website via a Pocket WiFi.(Purchase the product from supplier if needed) switch time of a designated load via an exteral Smart Plug (purchase the product from supplier if needed.) so that the load mostly consumes PV energy and incurs...
Step3. There is a setting guide on the LCD screen if it is the first time to start up, pls follow it. For specific setting, please refer to section 8 (Setting). Step4. Set WiFi according to wifi user manual. Step5. Operate “Self Test”. (if needed) SolaX X3-Hybrid inverter PV1+ PV1 - Ø...
Firmware Upgrading Firmware Upgrading 7. Firmware Upgrading Step2 User can upgrade inverter’s firmware via an U-disk. U-disk Ø Preparation Please ensure the inverter is steadily powered on. Inverter must connect PV panels and keep the battery on through whole procedure of upgrading.
Setting Setting 8. Setting 8.2 Menu Structure Grid All advance setting can only be set by the technician or the installer with Solar the installer password. 8.1 Control Panel Charger Safety Power Factor Load Grid Export Control Inverter Yield On-grid Remote Control Charger Yield Phase Power Balance...
Setting Setting Ø Status 8.3 LCD Operation Grid LCD Digital Display Solar The main interface is the default interface, the inverter will automatically jump to this interface when the system started up successfully or not operated for a Charger period of time. The information of the interface is as below.
Page 26
Setting Setting Ø History C) Charger This status shows the charger situation of the system. Include the battery Inverter Yield voltage, charge or discharge current. Charge or discharge power, battery Charger Yield capacity, battery temperature, BMS status, charge and discharge limit. “+” means in charging;...
Page 27
Setting Setting Ø Setting c) EPS Yield Safety The EPS Yield function contains charger yield for today, yesterday ,this (d-1-1) month ,last month and total. Power Factor (d-1-2) EPS Yield Grid (d-1-3) >Today: (d-1) Export Control (d-1-4) 00.0KWH On-grid Remote Control (d-1-5) Phase Power Balance (d-1-6)
Page 28
Setting Setting a) Date Time Safety (d-1-1) This interface is for user to set the system date and time. Power Factor (d-1-2) Date time Grid (d-1-3) 2013 ->06 <-06 (d-1) 10:19 Export Control (d-1-4) On-grid Remote Control (d-1-5) b) Language Phase Power Balance (d-1-6) This inverter provides several languages for customer to select.
Page 29
Setting Setting Reactive power control, Reactive standard curve cos φ = f(P) d-1-3) Grid The enduser do not need to set the grid parameters. All default value has set on For VDE ARN 4105, curve cos φ = f(P) should refer to curve A. default value of setting is as factory according to safety rules.
Page 30
Setting Setting d-1-4) Export control d-1-7) Grid Service This function allows the inverter able to control energy exported to the grid. Grid Service can be selected from “Sustain” or “Stop” . The default is “Sustain”. There are user value and factory value. The factory value is default which can not Every country’s requirements for the safety of battery storage inverter is different.
Page 31
Setting Setting (d-2) Reset Inv Energy Charger (d-3-1) (d-2-1) Battery (d-2-2) (d-3-2) Reset Errorlog (d-3) Reset Meter Energy (d-3-3) Reset d-2-1) Charger (d-3-4) Reset Load Here the user can set the parameters of charger on this page, the inverter is only compatible with lithium battery. Users can set the charge & discharge Factory Reset (d-3-5) parameters and awaken mode.
Page 32
Setting Setting d-3-4) Reset Load (d-4) Work Mode (d-4-1) User can reset the specific load’s energy if the inverter is installed with a User-define (d-4-2) Relay Control smart plug. New Password (d-4-3) Reset Load Consume Reset Load1 >No< d-4-1) Work mode There are 4 work modes for choice.
Page 33
Wifi SN This function can only be achieved with solax product “Smart Plug”. For specific operation, please refer to “ Smart Plug user manual”. Registration code Machine Type Relay Control >Relay1 Setting...
This section contains information and procedures for solving possible problems DCI over current protection Fault. with X3-Hybrid inverters, and provides you with troubleshooting tips to identify • Wait for a while to check if back to normal. DCI OCP Fault •...
Page 35
• Or seek help from us, if can not go back to normal state. connected and undamaged? Other Devide Fault Contact SolaX Customer Service for further assistance. Please be prepared to • Disconnect PV+ , PV- , grid and battery, reconnect them. BatRelayFault describe details of your system installation and provide model and serial number •...
Troubleshooting Decommissioning 10. Decommissioning 9.2 Routine Maintenance Inverters do not need any mainteinance or correction in most condition,but if 10.1 Remove the Inverter the inverter often loses power due to overheating,this can be the following reason: Disconnect the inverter from DC Input and AC output. ●...
Need help?
Do you have a question about the X3-Hybrid and is the answer not in the manual?
Questions and answers