Advertisement

Quick Links

99 Washington Street
Melrose, MA 02176
Fax 781-665-0780
TestEquipmentDepot.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Rapport 337 and is the answer not in the manual?

Questions and answers

Summary of Contents for Test Equipment Depot Rapport 337

  • Page 1 99 Washington Street Melrose, MA 02176 Fax 781-665-0780 TestEquipmentDepot.com...
  • Page 2: Table Of Contents

    Before Using Rapport 337 1. Safety Information • WARNING • Battery Charging & Its Precautions 2. Introduction of Rapport337 • FEATURES • Main Functions of RAPPORT337 • Standard Items • Names & Functions of Each Part 3. Specifications of Rapport337 •...
  • Page 3: Warning

    Rapport 337. Set up the range for measuring voltage, current and resistance for their known values and use the maximum range for unknown values And when there is any question when in use or there is any to protect the unit from damage.
  • Page 4: Battery Charging & Its Precautions

    •Turn off the power to the circuit to be measured and discharge all high voltage capacitance before starting resistance or continuity tests to avoid damage to the Rapport 337. •Put the finger behind the protecting pad when using a probe.
  • Page 5: Features

    This will guide CCTV installer to understand the Protocol and find the fault device easily. • UPT Cable tester ▶ The wiring condition(disconnected, shorted) of UTP cable can be checked out. Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176 FAX 781.665.0780 - TestEquipmentDepot.com...
  • Page 6: Standard Items

    ◉ Standard Items ◉ Names & Functions of Each Part Check the contents of your Rapport337 package with the standard checklist below placing them on a level place. • Rapport337 Main Body • User's Manual • Test Lead Set(Red, Black) •...
  • Page 7 Part Name Function Part Name Function ① Power LED ⑦ Key Button Red LED is on when the system is switched on METER PART Charge ② Green LED is on when being charged Resistance Indicating LED It measures resistance Button Data Transmitting ③...
  • Page 8 Part Name Function ① Input BNC It inputs external image signal It outpus input image signal to Rapport337 ② Output BNC Part Name Function or internally generated Video Test Signals It is the port of input & output of communication Communication ③...
  • Page 9: General Specifications

    ◉ General Specifications ◉ Meter Specifications Measuring Minimum 12V ± 10%, above 1A Input Voltage Measured Value Accuracy Item Measuring ±(0.8% + 2dgts) Battery Chargeable Ni-MH battery 6EA (AA size) 400mV 100uV Electric Characteristic Charging Time Above 8 hrs Built-in Charger DC Voltage Operation time More than 4 hrs...
  • Page 10: Power On/Off

    Battery indicator : [][][][] RAPPORT : User's name(Name can be changed in Main menu.) •Model & software versions are subject to be changed without any further notice. Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176 FAX 781.665.0780 - TestEquipmentDepot.com...
  • Page 11: Mode Setup

    •View Information mode : ◉ Mode Setup At this mode, the basic information of RAPPORT337 can be seen. (version, battery residual, communications protocol, & speed.) •LCD Screen is changed in order of VIDEO METER whenever key is pressed once. •Main Setting mode : At this mode, the basic setup of RAPPORT337 can be changed.
  • Page 12 OSD Screen Setup Enter the PATTERN GENERATION MODE when key is pressed in VIDEO mode. Output video system is changed to NTSC or PAL, using key. Output pattern can be seen COLOR BAR, RED, BLUE, GREEN or its reverse order, using key.
  • Page 13: Digital Multi Meter

    •Description of METER MODE LCD WINDOW ◉ DIGITAL MULTI METER Voltage, current, resistance, continuity can be tested. W A R N I N G To prevent an electric shock, injury or damage to RAPPORT337, cut off the power supply of the circuit, and discharge all the high-voltage capacity before testing resistance and continuity.
  • Page 14 •TESTING CONTINUITY Part Function Description Continuity means the presence of a complete path for current to flow. And the continuity test features a beep that sounds when a circuit is complete. DC Voltage test The beep allows users to quickly test continuity without having to watch the display.
  • Page 15 In case of DC to be measured, place the red lead on + point, and the black lead on - point, each on the voltage source. Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176 FAX 781.665.0780 - TestEquipmentDepot.com...
  • Page 16: Ptz Controller

    ◉ PTZ CONTROLLER W A R N I N G •How to connect each terminal and LCD screen Check for the location of the test lead set at current test mode. Place PTZ Operation Test : The basic operation of PTZ : Up, Down, Left, Right, the red lead at mA only for below 400mA, and place it at 10A when the and Zoom, and Manual focus controlling are possible, also.
  • Page 17 1 up to 99. TOUR can be designated in the MENU of PTZ. to the RX terminal of the Rapport 337. SPD : Place the cursor at the location of SPD, applying the procedures •How To Control PTZ...
  • Page 18 •CONTROL SETUP of PTZ •BAUDRATE : Setup of TRANSMISSION SPEED The initial setup is 2.4KBps, it can be made up to 2.4Kbps PTZ ADDR is activated on the upper part on LCD screen, when ~ 38.4Kbps. It is done by pressing &...
  • Page 19: Utp Cable Tester

    •A user can put the name he or she wants at USER NAME by editing. •At SLEEP TIME, power goes OFF automatically, if the button is not pushed down for a fixed time. Direct cable Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176 FAX 781.665.0780 - TestEquipmentDepot.com...

Table of Contents