Download Print this page

Battery Installation; Controls And Jacks - Sealey TM105 Instructions

Professional auto-ranging digital clamp meter ncvd 6-function

Advertisement

WARNING! NEVER apply voltage or current to the meter that exceeds the specified maximum as shown below:
Function
A AC
V DC, V AC
Resistance, Diode, Continuity ,
WARNING! USE EXTREME CAUTION when working with
high voltages.
1.4.

BATTERY INSTALLATION

WARNING! To avoid electric shock, disconnect the test
leads from any source of voltage before removing the battery
cover.
Disconnect the test leads from the meter.
Open the battery cover by loosening the cover screw
using a Phillips head screwdriver.
Insert the battery into battery holder, observing the correct
polarity.
Replace the battery. Secure with the screw.
WARNING! To avoid electric shock, do not operate the meter
until the battery cover is in place and fastened securely.
NOTE! If the meter does not work properly, check the battery to
make sure that it is still good and that it is properly inserted.
2. FEATURES
High precision clamp meter. Conforms with EN61010-1
CATIII 600V safety requirements for electrical equipment for
measurement, control, and laboratory use.
Features Non-contact AC voltage detection function while
controls are laid out to enable use with one hand. Includes
data/max hold functions. Double moulded housing with soft
grip case and large, backlit display for ease of use even in
dark areas. Supplied in zipped pouch with carry strap.

CONTROLS AND JACKS

1.
Current Clamp
2.
Non-Contact AC Voltage Indicator Light
3.
Clamp Trigger
4.
Rotary Function Switch
5.
Data Hold Button
6.
Back Light Button
7.
LCD Display
8.
Mode Select Button
9.
Range Button
10.
Max Hold Button
11.
Com Input Jack
12.
V, Ω CAP, TEMP, Hz, Jack.
13.
Battery Cover
© Jack Sealey Ltd
Input Limits
Maximum Input
400A
600V DC/AC
250V DC/AC
1
2
3
6
7
8
11
13
Original Language Version
REMOVE
SCREW TO
ACCESS
BATTERY
TM105
Issue No: 2(I) - 17/06/14
4
5
9
10
12

Advertisement

loading