Section 4 Mounting; Required Tools; Checking Environmental Conditions And Mounting Space; Mounting The Ied - ABB 630 series Installation Manual

Hide thumbs Also See for 630 series:
Table of Contents

Advertisement

1MRS755958 C
Section 4
4.1
4.2
4.3
4.3.1
630 series
Installation Manual
Mounting

Required tools

Use Torx TX10 and TX15 screwdrivers when attaching the mounting kits to the
IED. Use a 2.5 mm Allen Key when mounting the external display module.
Checking environmental conditions and mounting
space
The mechanical and electrical environmental conditions at the installation site must
be within the limits described in the technical manual.
Avoid installation in dusty, damp places.
Avoid places susceptible to rapid temperature variations, powerful vibrations
and shocks, surge voltages of high amplitude and fast rise time, strong induced
magnetic fields or similar extreme conditions.
Check that sufficient space is available.
Sufficient space is needed at the front and rear of the IED to allow access to
wires and optical fibres and to enable maintenance and future modifications.
It is possible to add or replace flush mounted IEDs without excessive
dismantling.

Mounting the IED

Flush mounting the IED

1.
Make a panel cut-out and drill four holes according to the dimensional drawing.
2.
Locate the IED securely in the mounting frame using the required screws.
3.
Tighten the screws.
4.
Mount the IED with the mounting frame to the panel cut-out.
Section 4
Mounting
15

Advertisement

Table of Contents
loading

Table of Contents