Ketra N3 Satellite Installation Manual page 11

Hide thumbs Also See for N3 Satellite:
Table of Contents

Advertisement

STEP 1
Connect power and signal output to G2 Linear luminaires.
Note: Details on G2 linear connections available in G2 Installation Guide.
1.
Open appropriate terminals by flipping orange levers into UP position. (see
2.
Make connections to the "Power and Signal OUT" section connecting to appropriate line, neutral
and ground terminals.
Note: wire strip length is 12mm/.47 inches.
3.
Insert appropriate conductors from G2 leader cable. (see
Black conductor goes to "L" terminal.
White conductor goes to "N" terminal.
Green conductor goes to "
Red conductor goes to the "S" terminal.
I N S TA LL ATI O N
6
Fig. 8
7
PAGE 11
INSTALLATION
6
" terminal.
7
N3
INSTALLATION INSTRUCTIONS
770-000014-01 r02
I N S TA LL ATI O N
fig.
8)
fig.
9)
Fig. 9
770-000014-01-01-r3
N3 INSTALLATION GUIDE
PAGE 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

N3

Table of Contents