4.3.2 Assembling the stand
7 Assembling Procedure 1
1. Place the base upside-down.
2. Insert the left and right stand pipes into the base. (CAUTION !: Insert pipes so they face in the proper direction.)
3. Fasten the pipes to the base with the supplied screws. (Tighten the central screws first.)
Stand pipe, L
Base
7 Assembly procedure 2
1. Align the vertical pipe with openings in the left and right stand pipes.
2. Tighten bolts with the supplied hexagonal wrench to secure the vertical pipe.
3. Insert caps into openings in the left and right stand pipes.
Screw (4 x 12)
Screw (4 x 12)
Cap
Bolt (M6 x 40)
Hole
Table-top Stand: PDK-5001
* Tighten these screws first.
* Insert the pipe so the larger openings
face outward.
Vertical pipe
Bolt (M6 x 40)
Stand pipe, R
Hexagonal
wrench
Cap
39