Figure 4-7 Disconnecting The Cable From The Pmu; Figure 4-8 Disconnecting The Cables From The Subrack - Huawei BBU3900 Hardware Maintenance Manual

Hide thumbs Also See for BBU3900:
Table of Contents

Advertisement

4 Replacing the Components in the OMB
2.
3.
Step 5 Remove the component to be replaced.
1.
4-6
Disconnect the monitoring signal cable from the PMU, as shown in

Figure 4-7 Disconnecting the cable from the PMU

Disconnect the AC input power cable and DC output power cable from the subrack, as
shown in
Figure
4-8.

Figure 4-8 Disconnecting the cables from the subrack

Loosen the M3 screw on the panel of the PDU, and then remove the PDU, as shown in
Figure
4-9.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
BBU3900
Hardware Maintenance Guide
Figure
4-7.
Issue 03 (2010-06-05)

Advertisement

Table of Contents
loading

Table of Contents