4 Replacing the Components in the OMB
2.
3.
Step 5 Remove the component to be replaced.
1.
4-6
Disconnect the monitoring signal cable from the PMU, as shown in
Figure 4-7 Disconnecting the cable from the PMU
Disconnect the AC input power cable and DC output power cable from the subrack, as
shown in
Figure
4-8.
Figure 4-8 Disconnecting the cables from the subrack
Loosen the M3 screw on the panel of the PDU, and then remove the PDU, as shown in
Figure
4-9.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
BBU3900
Hardware Maintenance Guide
Figure
4-7.
Issue 03 (2010-06-05)