Electrical Connections; Grounding And Bonding; Determine Incoming Voltage Requirements; For Incoming Voltage Of 230 Vac - Aquacal DIG-220 Owner's Manual

Autopilot pool pilot digital salt chlorine generator important ! swimming pool & spa purification system
Table of Contents

Advertisement

Mounting the Control Unit Continued:
Read the following section complety before proceeding (damage to wires and connectors may occur):
1.
Level and tape the mounting template to the selected
mounting location. Mark the wall for the four (4)
mounting holes.
3.
Loosen, but do not remove the four (4) thumbscrews
on the sides of the unit cover. Carefully slide off the
outer housing cover. Disconnnect the 3 plugs that
connect to the display (mounted inside the cover).
The display circuit board does not need to be removed
from the cover.
5.
Hang the DIG-220 on the four mounting screws.
Using a long shaft slotted screwdriver, tighten the
screws through the black plastic access holes.
6.
For access to the electrical terminal strip, remove
the four screws and lift off the inner metal protective
cover.
7.
Safely set the metal protective cover aside.

Electrical Connections

The DIG-220 uses both high and low voltage connections. High voltage connections will be made for providing the direct input power. Additional high voltage connections
may be made to the filter pump from the DIG-220. Low voltage connections will be made to the Tri-sensor and Pool Pilot Cell. Additional low voltage connections are provided for
optional equipment such as a pH/ORP or electronic controller.
WARNING

Grounding and Bonding

Connect a ground wire from the primary electrical input to the grounding lug located inside the box. Also ground any piece of high voltage equipment that is connected to the
DIG-220 relay. The DIG-220 must also be connected to the pool bonding system with an 8 AWG (6 AWG for Canada) wire. A lug is provided on the bottom exterior of the
unit.

Determine Incoming Voltage Requirements

AC LINE IN
The DIG-220 is pre-wired from the factory for 230 Vac using a 3-ampere fuse on the AC input. Short test leads are attached to the AC terminal strip and must be removed
prior to installation.
If 115 Vac input power is required, please follow steps in section entitled "For incoming voltage of 115 Vac" on pages-15.

For incoming voltage of 230 Vac:

For incoming voltage of 230 Vac, confirm the "TRANSFORMER PRIMARY" is wired as indicated in FIG-11G.
14
INSTALLATION
DRILL ¼" (6mm)
TOP
TEMPLATE FOR DRILLING
POOL PILOT SOFT TOUCH
& POOL PILOT DIGITAL
MOUNTING HOLES.
DRILL 4 ¼" (6mm) HOLES FOR
WALL ANCHORS WHERE SHOWN.
BOTTOM
DRILL ¼" (6mm)
Inside Metal
Cover
Failure to heed the following may result in permanent injury or death.
Insure the electrical panel or filter pump circuit breaker is turned OFF before wiring the DIG-220. Follow all state, local, NEC,
CEC codes as applicable. AquaCal AutoPilot recommends a licensed electrician or certified electrical contractor perform the
electrical connections.
(CONTINUED)
2.
Plastic anchors and screws have been provided
for concrete or stucco walls. Drill and install
DRILL ¼" (6mm)
anchors and screws. Leave a 1/4" gap from the
wall when tightening the screws.
P/N 18550
DRILL ¼" (6mm)
A
FIG-11
4.
Safely set the cover aside.
C
FIG-11
8.
See Electrical Connections on page-14, 15,
& 16 for terminal connections.
9.
After terminal connections have been made,
reverse steps 3-8 to re-install the metal and external
covers.
Make sure to route and connect the 3 cables
through the side slot in the protective cover properly ,
then replace the outer housing cover after first
connecting the 3 plugs (that were disconnected
E
FIG-11
in step 3).
INNER
Terminal Strip
B
FIG-11
D
FIG-11
F3
F2
F1
F
FIG-11
TRANS-
TAB 10
TAB 9
230 Vac
TAB 8
TAB 7
FACTORY
230VAC
TAB 6
TAB 5
TAB 4
TAB 3
G
FIG-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents