Huawei DBS3900 Installation Manual page 200

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

16 Checklist for the DBS3900 Hardware Installation
No.
12
13
16-2
Item
The distance between the bundled fiber and the BBU panel is between 40 mm and
70 mm.
Labels are correct, legible, and complete on both ends of each cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
DBS3900(ICR)
Installation Guide
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents