Connector - Iridium EDGE User Manual

Hide thumbs Also See for EDGE:
Table of Contents

Advertisement

Test Name
Vibration Testing
Shock
Immersion Testing
Fungus Testing
Humidity
Chemical Splash
Resistance
Salt Spray Resistance
Dust and Steam Cleaning
Low Pressure Storage

2.8 Connector

The Iridium Edge connector terminates with a pig tail cable that allows for side and bottom cable exits.
Table 2-2 Environmental Specifications
Test Reference
SAE J1555, Section 4.10
SAE J1455
SAE J1455, Section 4.3.3.2
SAE J1455, Section 4.6.3
SAE J1455, Section 4.2
SAE J1455, Section 4.4.3.2
SAE J1455, Section 4.3.3.1
SAE J1455, Section 4.5.3
SAE J1455, Section 4.9.3
28
Test Description
5 hours on each axis as per figures 6,7 and 8 in SAE J1455
Drop 1m onto concrete in 3 perpendicular orientations (3 drops)
3 dunks
Cable mated when dunked
Duration of 30 days
Temperature Range : -40 to 85C
Relative Humidity : 90%
Number Cycles : 30
Duration of Cycle : 8 hours
Brush method
Duration of 96 hours
At level 4
At -40C for 48 hours

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents