Sime MURELLE HE 110 R User Instructions
Sime MURELLE HE 110 R User Instructions

Sime MURELLE HE 110 R User Instructions

Hide thumbs Also See for MURELLE HE 110 R:

Advertisement

ENsurE that thEsE INstructIoNs arE lEft for
uK
thE usEr
MURELLE
HE 110 R (M)
User instructions
Please read the Important Notice within
this guide regarding your boiler warranty
199838

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MURELLE HE 110 R and is the answer not in the manual?

Questions and answers

Summary of Contents for Sime MURELLE HE 110 R

  • Page 1 ENsurE that thEsE INstructIoNs arE lEft for thE usEr MURELLE HE 110 R (M) User instructions Please read the Important Notice within this guide regarding your boiler warranty 199838...
  • Page 2 For the first year all of our appliances are protected by our manufacturer’s guarantee which covers both parts and labour. As you would expect from Sime Ltd, it is our aim to provide our valued customers with the best in after sales and service.
  • Page 3 IpX4D Murelle HE 110 R (M): Gas Council number 41-283-28 CONTENTS LIGHTING AND OpERATION .......................... pag. ERRORS AND SOLUTIONS ..........................pag. WarNINGs – In case of fault and/or incorrect equipment operation, deactivate it, without making any repairs or taking any direct action.
  • Page 4 APRE lIGhtING aND oPEratIoN BoIlEr IGNItIoN (fig. 24) The first ignition of the boiler must be carried out by qualified technical personnel. Successively, if it is necessary to APRE start up the boiler again, adhere strictly to the following instructions: open the gas isolation valve to allow the flow of the fuel and move the main switch of the system to “ON”.
  • Page 5 Circuito riscaldamento 2 Circuito riscaldamento 3 (impianto tre zone) APRE Fig. 25/a Circuito regulation of the external sensor relative alarms and solutions are gi- riscaldament (fig. 25/a) ven below: If an external sensor is installed, the – alarM 02 (fig. 27/a) value of the output temperature is If the water pressure detected is automatically chosen by the system,...
  • Page 6 Circuito riscaldamento 2 Circuito riscaldamento 3 (impianto tre zone) – all 09 – all 14 – all 23 request assistance from quali- request assistance from quali- request assistance from quali- fied technical personnel. fied technical personnel. fied technical personnel. – all 10 –...
  • Page 8 1a Blue Ridge Park Thunderhead Ridge Glasshoughton, Castleford, WF10 4UA Phone: 0845 9011114 Fax: 0845 9011115 www.sime.co.uk Email: enquiries@sime.co.uk...

This manual is also suitable for:

Murelle he 110 m

Table of Contents