Switching On For The First Time - ONNLINE ESSENSSE Instruction Manual

Air curtain
Table of Contents

Advertisement

Available languages

Available languages

6. INSTALLATION
4.7. Install the bottom cover
1. slide the cover into the grooves (see picture below - direc-
tion 1)
2. pull the cover towards the unit (see picture below - directi-
on 2)
3. screw the bottom cover to the unit
2
1
7. SWITCHING
ON FOR THE FIRST TIME
ATTENTION!
Before putting the air curtain into operation check:
Whether any tools or other items that could damage the air
curtain have been left in the air curtain.
Whether the electrical power supply is properly connected
and whether the heating water connection is properly co-
nnected.
Whether the all the covers are properly attached.
Whether the control panel is correctly connected.
By turning on for the first time test that the device is in order
(the fans run, heating). Check other possible settings and pro-
duct functions according to the individual regulation module
user's manuals.
REGULATION AND ACCESSORIES
It is possible to connect the following regulation modules to
ESSENSSE air curtains:
Regulation
Type
DK-1
type
of
curtain
cold
X
DM
water
X
electric
X
cold
-
RF
water
-
electric
-
x ... can be connected
- ... cannot be connected
You will find a detailed description of the accessories in the
manuals of the individual regulation modules.
7.1 SETTING THE DIRECTION OF THE AIR
EXHAUST
ATTENTION!
Perform the setting during the installation of the curtain by
deviating the exhaust to the required direction. The Essen-
sse air curtain makes it possible to turn the air exhaust at the
maximum angle of 15°. The exhaust direction setting is not
designed to be moved frequently.
SH-
TER-P
ZV-3
DS
TV1/1
-TM-
848
X
-
-
X
-
RGJ-VCE-DM-S
X
X
X
X
X
RGJ-VCE-DM-V
X
X
-
X
-
RGJ-VCE-DM-E
-
-
-
X
-
RGJ-VCE-RF-VS
-
-
-
X
X
RGJ-VCE-RF-VS
-
X
-
X
-
Regulation
code
RGJ-VCE-RF-E
13

Advertisement

Table of Contents
loading

Table of Contents