6. INSTALLATION
4.3. Pulling the supply cables through
Pull a sufficient length of power cable through into the unit.
Pull through the communications cable if you will use the DM
regulation module.
Pull through the cables for accessories, if used.
ATTENTION!
The power cable must be determined by the project en-
gineer in the given building, it must conform to valid
norms and codes and must respect the performance and
installation parameters of the curtain.
4.4. Installation of the regulation module (the
regulation module is not included with the cu-
rtain)
1. insert the appropriate regulation module into the unit
2. fasten 3x self-tapping bolts M5 using an Allen key M5 (the
bolts are included in the regulation module package)
ATTENTION!
You need an extension attachment at least 20cm long
4.5. Connecting the cables
6.1. secure the electrical power cord in the pull reduction
elements
12
6.2. connect together the TYCO connectors
6.3 connect together the switching elements and if appro
priate the DM regulation module, connect the communi
cation cable
6.4 finally connect the power cable as shown in the connec-
tion diagram
4.6. Installation of partitions
1. Attach the inner side panel and screw in the designated
screws using a size M5 Allen key
2. return the magnets to their original position + attach tool
3. put the designated side panel back in its place