Table Of Contents; The Benchmark Scheme - Ariston ST 100 ProTech Instructions For Installation, Servicing And Use

Unvented hot water storage cylinders
Table of Contents

Advertisement

TABLE OF CONTENTS

1.
2.
2.1
2,2
2.3
3.
3.1
3.2
3.3
3.4
3.6
3.7
3.8
Connection of Mains Supply
3.9
3.10
3.11
3.12
3.13
3.14
4.
5.
5.1
ProTech Anti-corrosion System
5.2
5.3
5.4
5.5
5.6
Maintenance
6.
7.
TECHNICAL INFORMATION
8.
9.
1.
The Benchmark
Scheme
2
Benchmark places responsibilities on both manufacturers and installers.
The purpose is to ensure that customers are provided with the correct
equipment for their needs, that is installed, commissioned and serviced in
accordance with the manufacturer's instructions by competent persons and
that it meets the requirements of the appropriate Building Regulations. The
Benchmark Checklist can be used to demonstrate compliance with Building
Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing
work in accordance with the Benchmark Code of Practice which is available
from the Heatinmg and Hotwater Industry Council who manage and promote
the Scheme. Visit www.centralheating.co.uk for more information.
Page 2
Page 3
Page 3
Page 3
Page 4
Page 5
Page 5
Page 5
Page 5
Page 5
Page 6
Page 7
Page 8
Page 11
Page 14
Page 14
Page 14
Page 17
Page 19
Page 24
Page 26
Page 26
Page 26
Page 26
Page 26
Page 27
Page 27
Page 29
Page 30
Page 34
Page 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents