Preparations Before Installation - Daikin BEVN32AV1 Installation Manual

Vrv system air conditioners
Table of Contents

Advertisement

〈〈Installation space〉〉
Install so that the EL. COMPO. BOX lid is facing down.
Maintenance hole
600 or more
Be sure to create a
maintenance hole the
size shown in the
righthand figure.
NOTE) If the Maintenance hole cannot be installed directly
below, make sure there is at least 400mm of space.
(2) After considering whether the location the unit is to be installed can support its weight, if it seems
dangerous, install it after reinforcing the location with boards, crossbeams, etc.
(3) Avoid any contact with the ceiling surface, as this may cause noise and vibration.
[CAUTIONS]
• Install the indoor and outdoor units, power supply wiring, transmission wiring and remote controller wiring
at least 1 meter away from televisions or radios in order to prevent image interference or noise.
(Depending on the radio waves, a distance of 1 meter may not be sufficient enough to eliminate the noise.)
〈〈Pasting position of heat insulation material〉〉
Paste the heat insulation material to the position indicated by

5. PREPARATIONS BEFORE INSTALLATION

(1) Check the relative locations of ceiling hole, unit, and hanging bolts.
289
(Suspension bolt pitch)
(2) Open the eyebolt holes or the holes for passing the piping and wiring out of the unit.
• Set the locations for the above holes, open them up and then lay the piping (refrigerant) and wiring
(including both power supply and transmission wiring) up to the piping and wiring connections in the
unit. (See "7. REFRIGERANT PIPING WORK" and "8. ELECTRIC WIRING WORK" for details.)
• It might be necessary to reinforce the ceiling frame to maintain the levelness and to prevent vibration.
Consult an architect or carpenter for details.
(3) Install the hanging bolts. (Use M8 hanging bolts.)
• If it is pre-set, use hole-in anchors. Otherwise, use embedded inserts or embedded foundation bolts to
make sure that the weight of the unit can be supported. Adjust the distance to the ceiling beforehand.
English
EL. COMPO. BOX lid
200 or more
289
<Example of installation>
(Suspension
bolt pitch)
NOTE) All the above parts are field supplied.
Connected to
outdoor unit
200 or more
(Service space)
Fig. 1
.
200
(length: mm)
Anchor
BEV unit
proper
Connected to
indoor unit
Wire service
entrance
(length: mm)
Ceiling slab
Long nut or turnbuckle
Suspension bolt
(length: mm)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bevn50av1Bevn125av1

Table of Contents