Before Initial Start-up

NOTE: The unit has been run and tested at the factory
prior to being shipped and does not require any type of
break-in.
CAUTION
Engine damage. Verify proper type and quantity of
engine oil prior to starting engine. Failure to do so
could result in engine damage.
NOTE: The unit comes filled with 5W-30 weight synthetic
oil from the factory. Check the oil level and add the
appropriate viscosity and amount if necessary.

Installation Wizard

The installation wizard immediately appears upon power-
up. It allows the user to input generator settings. See
Figure 7-2.
The installation wizard will start every time AC and DC
power are removed and reapplied to the generator.
Installation Guidelines For 60 Hz EcoGen™ Generators
Table 7-1. Activation Chart
Use arrow keys to
scroll and find the first
number
Activation Code.
Press
select.
Repeat this step until
all digits have been
entered.
Use
ESCAPE
correct previous digits.
002230
Activation is complete
when all digits are
entered
your screen shows this
display.
Follow the controller
prompts to continue
setting
function. Refer to your
Owner's Manual with
questions.
002231

Interconnect System Self Test Feature

This controller will go through a system self test at power
up, which will check for a signal from the remote two wire
start wires 178 and 183. This is done to prevent damage
if the installer incorrectly connects AC power to the N1
and N2 wires into the DC terminal block. The controller
will display a warning message and lock out the
generator, preventing damage to the controller, if voltage
is detected at the DC terminal block. Power to the
controller must be removed to clear this warning.
Voltage must be present at the N1 and N2 terminals
(000135)
inside the generator control panel for this test to be
performed and pass.
NOTE: All appropriate panels must be in place during
any operation of the generator. This includes operation
by
troubleshooting procedures.

Before starting, complete the following:

1. Verify that the generator is off.
2. Set the generator main circuit breaker to OFF
3. Turn off all breakers that will be powered by the
Control Panel Start-Up/Testing
Troubleshooting
of
your
ENTER
to
to
What happens if "Wrong Passcode Try
above
and
Again" appears?
Re-enter the activation code. If a
second attempt is unsuccessful, check
the number against the code given on
activategen.com. If it is correct and the
the
time
generator will not accept it, contact 1-
888-9ACTIVATE (922-8482, US & CA
only).
a
servicing
technician,
(OPEN).
generator.
while
conducting
33

Advertisement

Table of Contents
loading

Table of Contents