Checking Gas Line Connections - Generac Power Systems 15 kW EcoGen Installation Manuallines

60 hz air-cooled generators
Hide thumbs Also See for 15 kW EcoGen:
Table of Contents

Advertisement

Checking Gas Line Connections

1. Check for leaks by spraying all connection points
with a non-corrosive gas leak detection fluid. The
solution should not be blown away or form bubbles.
2. Check gas pressure at the regulator in the
generator by following these steps.
Close gas supply valve.
Remove the top gas pressure test port from the
regulator (see
Figure
pressure tester (manometer).
Open the gas supply valve and verify the pressure
is within the specified values.
Record static gas pressure:
NOTE: Gas pressure can also be tested at the
manometer port on the fuel shut-off valve shown in
Figure
5-3.
NOTE: See the owner's manual or the spec sheet for
proper fuel pressure specifications. If the gas pressure is
not within specifications, contact the local gas supplier.
3. Close gas valve when completed, but keep
manometer connected for future tests of the
generator while starting, running and under loads.
Figure 5-4. Checking Pressure with Manometer
Installation Guidelines For 60 Hz EcoGen™ Generators
5-4) and install the gas
001807
Fuel Conversion / Gas Connections
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 15 kW EcoGen and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents