Unpacking & Assembly - Dirty hand 107036 Operation Manual

25-ton & 30-ton vertical/horizontal log splitters
Table of Contents

Advertisement

Unpacking & Assembly
List of tools needed for assembly:
• Needle nose pliers • Scissors • Box Cutter or knife
• (2) 17mm wrenches • (2) 19mm wrenches
IMPORTANT: The hydraulic tank is pre-filled with AW46 hydraulic
fluid and the engine is pre-filled with 10W30 engine oil at the factory.
Two (2) people may be required for assembly
1. Cut and remove the box and additional packaging.
2. Cut and remove banding using scissors.
3. Remove engine guard
underneath the engine (see arrow). Recycle engine guard.
4. Cut and remove bag around the tow coupler, cut zip tie and
lower tongue
. Extend tongue stand
3
5. Remove bolts, washers, and nuts
tongue mount bracket
6. Slide tongue
into the mounting bracket
3
the two holes in the tongue with the two holes in the
bracket and secure with hex bolt
washer
and hex nut
7
7. Lower beam into the horizontal position and secure beam
latch
. Two people may be required to complete operation.
14
8. Attach valve handle
with clevis pin
and cotter pin
10
9. Remove log splitter from metal pallet
Two people may be required to complete operation.
10. Check all fittings and hardware for tightness.
Item Description
1
Metal Pallet
2
Engine Guard
3
Tongue & Stand Assembly
4
Tongue Stand
5
Hex Bolt, M12 x 1.75 x 1.10mm, G8.8
6
Flat Washer, M12
7
Lock Washer, M12
8
Hex Nut, M12 x 1.75, G8.8
9
Valve Handle
10
Clevis Pin, 1/4 in. x 1/2 in.
11
Cotter Pin, 1/16 in. x 1/2 in.
12
Detent Valve
13
Beam & Cylinder Assembly
14
Beam Lock Bracket
15
Tongue Mount Bracket
!
WARNING
by removing the lynch pin
2
.
4
5
6
7
on tank.
15
, washer
5
, in two places.
8
into operational position and secure
9
.
11
and recycle pallet.
1
Qty.
1
1
1
1
2
4
2
2
1
1
1
1
1
1
1
from
8
, aligning
15
, lock
6
3
4
1
2
10
9
11
14
13
15
8
7
6
6
5
12
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

107079

Table of Contents