Page 1
Bezique II electric shower Installation and operating instructions nstallers please note these InstructIons are to be left wIth the user 2180591B June 2008...
Instructions for installers and service engineers only ...... 20 Spare parts ..................21 Fault finding .................. 23 Service policy, guarantee, etc...........rear cover To check the product suitability for commercial and multiple installations, please contact Triton’s specification advisory service before installation. Telephone: 0844 980 0730...
Bezique II electric shower PLEASE READ THIS IMPORTANT SAFETY INFORMATION Products manufactured by Triton are safe and without risk provided they are installed, used and maintained in good working order in accordance with our instructions and recommendations. WARNING: DO NOT operate shower if frozen, or suspected of being frozen. It must thaw ...
This book contains all the necessary fitting and Important: When first installed the unit operating instructions for your Triton Bezique II will be empty. It is essential the unit should electric shower. Please read them carefully. contain water before the elements are The shower installation must be carried out by a switched on.
Bezique II electric shower MaIn CoMPonents Fig. note: Not all wiring is shown for clarity Inside unit (fig.) Top cable entry Bottom pipe entry Rear pipe entry area Rear cable entry area Wall screw fixing Terminal block Power PCB 309 mm...
Bezique II electric shower ELECTRICAL REQUIREMENTS Shepperton Park, Triton Road, Nuneaton, Warwickshire, CV11 4NR WARNING! W-006-A THIS APPLIANCE MUST BE EARTHED The installation, supply cable and circuit protection must conform with BS 7671 (IEE Fig. wiring regulations) and be sufficient for the amperage required.
Page 7
For close circuit protection DO NOT use a above 30°C. Under these conditions, rewireable fuse. Instead use a suitably rated Bezique II electric shower derating factors apply and it is necessary to Miniature Circuit Breaker (MCB) or cartridge select a larger cable size.
Bezique II electric shower Water requIreMents Mains electric supply The installation must be in accordance with (via double pole switch) Water Regulations/Bylaws. To make sure of activating the heating elements, the shower must be connected to a mains water supply with a minimum running pressure of...
Bezique II electric shower sItIng of the shoWer WarnInG! Important: If installing onto a tiled wall the shower must not be positioned always mount the unit on the surface of the where it will be subjected to freezing tiles. nEVER tile up to the unit.
Bezique II electric shower fIttIng the shoWer to the Wall Fig. WarnInG! Check there are no hidden cables or pipes before drilling holes for wall plugs. Use great care when using power tools near water. the use of a residual current device (rCD) is recommended.
Page 11
Bezique II electric shower Screw top fixing screw into position leaving the base of the screw head protruding 6 mm out Fig.0 from the wall. Hook the backplate over the top screw and fit the bottom fixing screw into position. DO...
Bezique II electric shower PluMBIng ConneCtIons WarnInG! Plumbing to be carried out before wiring the outlet of the shower acts as a DO NOT use jointing compounds on any pipe vent and must not be connected to fittings for the installation.
Bezique II electric shower eleCtrICal ConneCtIons Fig. SWItch oFF thE ElEctRIcIty SUPPly At thE mAInS. Fig. shows a schematic wiring diagram. The cable entry points are shown in fig.. The cable can be surface clipped, hidden or via 20 mm conduit.
Bezique II electric shower CoMMIssIonIng Fig. The first operation of the shower is intended to flush out any remaining unit debris and to make sure the heater unit contains water before the elements are switched on. Refit the trimplate. Turn the valve spindle fully clockwise until the spindle hits the ‘stop’...
Page 15
Bezique II electric shower temperature control from minimum flow to maximum flow and back again several times to Fig. release any trapped air from within the unit. Once the flushing out has been completed, Temperature switch off the electricity to the shower at the...
Bezique II electric shower rePlaCIng the Cover Fig.0 Important: Before finally fitting the cover, the following steps must be taken: a. check the plumbing connections are watertight. b. check the terminal block screws are fully tightened. c. make sure the pipe and cable entering the unit do not prevent the cover locating correctly to the backplate.
Bezique II electric shower oPeratIng the shoWer Fig. Important: make sure the commissioning procedure has been carried out. When the electricity supply to the shower is switched on at the isolating switch, the POWER indicator will light. to start the shower...
Page 18
Bezique II electric shower to adjust the shower temperature WarnInG! The water temperature is altered by increasing after any servicing of mains water or decreasing the flow rate of the water through the shower via the temperature control (fig.). supply, always make sure the unit is...
Bezique II electric shower oPeratIng funCtIons Fig. Power on indicator (fig.) Power on indicator When the electricity supply to the shower is switched on at the isolating switch, the POWER Low pressure indicator will light. indicator low pressure indicator (fig.)
Bezique II electric shower InstruCtIons for Installers and servICe engIneers only CleanIng the Inlet fIlter Fig. It is recommended that the filter is periodically cleaned in order to maintain the performance of the shower. It is essential that this operation is carried out by an installer or service engineer.
Bezique II electric shower fault fIndIng Important: Switch oFF the electricity at the mains supply and remove the circuit fuse before attempting any fault finding inside the unit. Problem/symptom Cause action/Cure 1 Shower 1.1 Interrupted power 1.1.1 Blown fuse or circuit breaker. Check inoperable, no supply.
Page 23
When fitting a new PRD, follow the commissioning procedure. It is advised all electrical maintenance/repairs to the shower should be carried out by a suitably qualified person. In the unlikely event of a fault occurring please contact triton Customer Service. Do not remove the shower from the installation.
Need help?
Do you have a question about the Bezique II and is the answer not in the manual?
Questions and answers