Commissioning; Before Commissioning - Wetrok DISCOMATIC SAMBA XT Operating Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 34
5

COMMISSIONING

5.1

Before commissioning

Before commissioning / Initial commissioning
Delivery, or instructions on safety regulations, handling and maintenance, in addition to initial commissioning, are normally undertaken
by an approved expert. If this is not the case, the operating company is responsible for instructing the operator.
Items of jewellery, such as rings and chains, must be removed.
Before operation
1
Connect battery cables.
LED indicator at charger while charging
Fully charged.
Loading almost completed (approx. 20 min.).
LED indicator at operating lever while using
Fully charged.
Remaining battery capacity at approx. 30 %.
Is illuminated
Flashes
2
Recharge battery (approx. 6 hrs.).
The battery is fully charged,
when the green light is on.
Battery is loading.
Battery almost low, recharge immediately.
Battery low, machine is
switched OFF.
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents