(
QSz
649
~
be handed to the workshop
Operating instructions
for the double insulated and radio suppressed
Sheet Metal Shear QSz 649,
and type QSz 7 49 (42 Volts)
1. Technical Data
Current:
~
(AC single phase)
I
For
sheet
metal up to
Radius
of
1·
Cutting
Incisions
Capacity
Net weight
Type
I
j
sh.
toni
I
in.
smallest
curve
capacity
per minute
input
I
output
kp mm
2
.
mm
mm
I
in.
1m/min
I
ft./min
Watts
Watts
kg
I
lbs.
1
sq. m.
40
28.4
3.5
lfs
I
QSz
649
QSz
749
60
42.5
2.9
7
/641
25
1
3.5-7
11-21
1100
750
480
4.7
10
80
55.6
2.5
3 /32
2. Connection and Operation
Main voltage must correspond to the operating voltage marked
on the rating
plate.
The tool
can
be plugged
into
plain or safety
sockets
without
protective contact.
Switch must be in the
"Off"
position
w
hen
connecting.
To prevent damage to the insulation no
additional
marking plat-
es
must be riveted
or
screwed to the
casing. We
recommend the
use of
transfers
only.
The machine performs quick
and
clean cuts
w
h en blades
are
inserted and adjusted in
accordance
with the
instructions.
Stops
or jams
only
occur when
shear
is
worked
in the
wrong
position
and
will
be
eliminated
as
soon
as
the
shear is brought in
the
up-
right position. Do not use force!
If
necessary
switch off motor and restart cutting operation.
3.
Setting and
adjusting of cutter
blades
Insert shoe blade (53) in groove of shoe
and
plunger
blade
(52)
in
groove
of plunger. Fasten
lightly
with screws
(68, 69).
Do not
forget disc (44) and spring
wash
er
(81). Turn set screw
(45)
until
the corners
of
blades
at
highest
position
of plunger are 0.4
mm
(0.2 in.)
apart.
Then
fasten screw (68).
Adjust
shoe blade in order to
fit
with sheet thickness by
means
of
turning
set screw (72) until
the
gap
between
blades
is
set for
sheet of 40 kp/mm
at
0.7 mm (0.25
in.).
When
cutting
thinner
sh
eet
than max.
3.5
mm
(1.5
in.)
set gap at 0.2
mm
(0.1
in.)
x
sheet
thickness.
Then
fasten
screw
(69).
Turn
screw
(72) against
shoe
blade.
BE
307 e
5.
71
EW
I
The
given
data are approximately. Control the correct setting of
the blades.
Attention
!
Never work with
blunt
blades!
Remove blades
for
resharpening after unscrewing screws
(68,
69). Do not forget disc (44) and spring
washer
(81 ). When shar-
pening,
use plenty of
coolant and observe cutting angles
given
in Fig. b
and c.
Control
angle
with
gauge.
Attention!
Do
not cut welding
seams.
No claims can be entertained
fo
r damage
resulting
from
cutting
sheets
of heavier gauge
or
higher
strength than indicated
or
working
with
blunt
blades.
4.
Maintenance
and
lubrication
Before carrying out
any
maintenance
work
alw
ays
remember
to
pull
out the plug. Grease
t
h
e
machine
daily
at
the
lubricating
n
ipple
(83).
To
grease let
the
shear run
at
no load
until
clean
grease
emerges
at
the plunger.
After 300
duty hours
clean
air
openings
of
th
e
motorhousing
and
the
motor
by blowing
out
t
he
tool with
dry
pneumatic air or by
means
of a
brush.
Renew
the
gear grease. Loosen screw
(110)
and lift off gear
head. Only
use
special gear
grease
Sst
1,
50
g
(1.8 oz)
for
gears
(Order
ref:
MZ
60-3/Sst 1).
After 900 duty hours clean
machine
thoroughly.
Wash
gears in
clean
solvent and serve
with fresh
Sst
1.
Clean ball
bearings
and
serve
with
fresh Sst
1
(lh of
the space
between
inner
and
outer
ring).
Need help?
Do you have a question about the QSz 7 49 and is the answer not in the manual?
Questions and answers