Unpacking And Inspection - Nedap PowerRouter PR50S Installation And Operating Manual

Solar 5kw - 3.7kw - 3kw
Hide thumbs Also See for PowerRouter PR50S:
Table of Contents

Advertisement

4 Unpacking and inspection

This chapter is intended for installers
All PowerRouter units are thoroughly tested and inspected before they are packed and
transported. Although they are shipped in sturdy, recyclable packaging, damage may
however still occur during transportation.
It is important to carefully inspect the shipping packaging prior to beginning the
installation. If any external damage to the packaging makes you suspect the
PowerRouter itself could be damaged, or if you find that the PowerRouter is damaged
after unpacking it, report the damage immediately to your installer and to the
transportation company that delivered the PowerRouter.
If it becomes necessary to return the PowerRouter, please use the original packaging
in which it was delivered.
i
The PowerRouter weights 18 kg including packaging. To avoid injury,
ensure the use of proper lifting techniques and secure the help of a second
person to assist in the unpacking and installation of the PowerRouter.
PowerRouter box content:
1 PowerRouter PR50S
or
1 PowerRouter PR50S with PV-switch
or
1 PowerRouter PR37S
or
1 PowerRouter PR37S with PV-switch
or
1 PowerRouter PR30S
or
1 PowerRouter PR30S with PV-switch
1 wall-mounting bracket
1 Pouch containing:
1 Installation manual
1 Installation sheet
1 Drill template
Figure 3 Unpacking
10
part no. 9560688
part no. 9560947
part no. 9560874
part no. 9561145
part no. 9561161
part no. 9561188
part no. 5749034
part no. 5277337
part no. 5277329
part no. 5555477

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerRouter PR50S and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Powerrouter pr37sPowerrouter pr30s

Table of Contents

Save PDF