Download Print this page

Carrier 50PM20 Installation Instructions Manual page 54

Single package rooftop units electric cooling with electric heat option and electromechanical controls with puron (r-410a) refrigerant

Advertisement

UNIT
START-UP
CHECKLIST
MODEL
NO.:
SERIAL
NO:
DATE:
TECHNICIAN:
I.
PRE-START-UP:
[]
VERIFY
THAT ALL PACKING
MATERIALS
HAVE
BEEN
REMOVED
FROM
UNIT
[]
VERIFY
INSTALLATION
OF OUTDOOR
AIR HOOD
[]
VERIFY
THAT CONDENSATE
CONNECTION
IS INSTALLED
PER INSTRUCTIONS
[]
VERIFY
THAT ALL ELECTRICAL
CONNECTIONS
AND TERMINALS
ARE TIGHT
[]
CHECK
THAT INDOOR-AIR
FILTERS
ARE CLEAN
AND IN PLACE
[]
CHECK
THAT OUTDOOR
AIR INLET
SCREENS
ARE IN PLACE
[]
VERIFY
THAT UNIT IS LEVEL
[]
CHECK
FAN WHEEL
AND PROPELLER
FOR LOCATION
IN HOUSING/ORIFICE
AND VERIFY
SETSCREW
IS TIGHT
[]
VERIFY
THAT FAN SHEAVES
ARE ALIGNED
AND BELTS
ARE PROPERLY
TENSIONED
[]
VERIFY
THAT SCROLL
COMPRESSORS
ARE ROTATING
IN THE CORRECT
DIRECTION
[]
VERIFY
INSTALLATION
OF THERMOSTAT
[]
VERIFY
THAT CRANKCASE
HEATERS
HAVE BEEN
ENERGIZED
FOR AT LEAST
24 HOURS
II. START-UP
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2-L3
L3-L1
COMPRESSOR AMPS--COMPRESSOR
A1
--COMPRESSOR
B1
ELECTRIC HEAT AMPS (IF EQUIPPED)
SUPPLY FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
ELECTRIC HEAT SUPPLY AIR
PRESSURES
REFRIGERANT SUCTION
L1
L2
L3
L1
L2
L3
L1
L2
L3
L1
L2
L3
REFRIGERANT DISCHARGE
CIRCUIT A
CIRCUIT B
F DB (Dry Bulb)
F DB
F
CIRCUIT A
PSIG
CIRCUIT B
PSIG
PSIG
PSIG
PSIG
F WB (Wet Bulb)
[]
VERIFY
REFRIGERANT
CHARGE
USING
CHARGING
CHARTS
GENERAL
[]
ECONOMIZER
MINIMUM
VENT AND
CHANGEOVER
SETTINGS
TO JOB REQUIREMENTS
54

Advertisement

loading

This manual is also suitable for:

50pm2450pm28