Pre-Installation Checks; Unpacking And Inspection - GE IC755CxS06RDx User Manual

Quickpanel plus operator interface
Hide thumbs Also See for IC755CxS06RDx:
Table of Contents

Advertisement

4 Pre-installation Checks

4.1 Unpacking and Inspection

For phone numbers and email
addresses, refer to the section,
Contact
Information.
Pre-installation Checks
For public disclosure
This chapter provides information and procedures to perform pre-installation checks of
the QuickPanel
+
Operator Interface.
Before installing and using the QuickPanel
Unpacking and Inspection
Basic Setup
Initial Startup
Runtime Setup
Firmware Updates
Shutdown
Upon receipt of the QuickPanel
containers for damage. If any part of the system is damaged, notify the carrier
immediately. Save the damaged shipping container for inspection by the carrier. It is the
consignee's responsibility to register a claim with the carrier for damage incurred during
shipment.
After unpacking the unit, record all serial numbers. These are needed to contact
Customer Care during the warranty period. Save all shipping containers and packing
material for future transport or shipping. Verify that all system components have been
received and agree with the order. If the system received does not agree with your order,
contact Customer Care.
Before initial powerup, inspect the unit for loose or damaged components. If damage is
found (such as bent component leads or loose components), contact GE Intelligent
Platforms for additional instructions.
Caution
+
, complete the following procedures:
+
Operator Interface, carefully inspect all shipping
Do not apply power to the unit if it has visible
damage. Applying power to a unit with damaged
components may cause additional damage.
GFK-2847R 55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic755cxw07cdxIc755cxs12cdxIc755cxs10cdxIc755cxs15cdx

Table of Contents