P2 - Enhanced Demand Control - Pentair Goyen Precision P1 Installation And Operating Instructions Manual

Filter cleaning system controls
Table of Contents

Advertisement

Tube.Cleaner.
Available on the AC/AC baseboard, otherwise only when P-CTX is fitted. This allows the tube-cleaning parameters to be
specified: Select ON or OFF, then:
Period:
The frequency of the tube-cleaning pulse. 1 to 999 minutes.
Duration:
The duration of the tube-cleaning pulse. 1 to 60 seconds. This feature is used to control the pulse cleaning of the
differential pressure-sensing lines. In the case of the P1 with P-CTX, these may be used to clear the pressure lines of third-party
pressure gauges installed on the dust collector.
Network.
Allows the network address to be set for controllers running on a DCS. Values 0 to 255, and OFF. Setting to OFF takes the
Precision off the network.
Run.
Returns the controller to operating mode.
P2 – ENHANCED DEMAND CONTROL
Menu Structure
LEVEL 1 ENTRY
LEVEL 2 MENU ITEM
1
Code
2
Language
2a
2b
2c
2d
2e
3
Factory Defaults
4
On Time
5
Off Time
6
Display Units
6a
6b
6c
6d
6e
7
Demand Cleaning
7a
7ai
7aii
7b
7bi
7bii
8
Alarm Delay
9
High dP Alarm
10
Precoating
11
Pattern Cleaning
12
Blowdown Cycles
13
Remote Stop
13a
13b
14
Tube Cleaner
14a
14b
15
Maximum Interval
16
Hour Counter
17
Number of Slaves
18
Total Cycles
19
Network
20
Run
1
As described for the P1 interface.
* Available on the AC/AC baseboard, otherwise only when P-CTX is fitted.
** Only when P-MOD is fitted.
16
INSTALLATION AND OPERATING INSTRUCTIONS PRECISION
LEVEL 3 SUB-MENU OPTIONS
1
English
Italian
Spanish
German
French
1
1
1
kPa
Pa
in WG
mm H
0
2
mm Hg
Limits
Bandwidth
1
Hardwired
Automatic
1
*
Period
Duration
1
1
1
1
**
1
LEVEL 4 OPTIONS
Low dP
High dP
High dP
Bandwidth %
FILTER CLEANING SYSTEM CONTROLS
®

Advertisement

Table of Contents
loading

Table of Contents