Worcester 12/18 Instruction Manual page 36

For open vent & sealed central heating systems with mains fed domestic hot water greenstar heatslave external
Table of Contents

Advertisement

8 716 113 389d
30/3/10
14:01
1
max
C
2
max
3
max
C
4
max
C
D
36
STARTING THE APPLIANCE
Page 36
max
flue
boiler
reset
reset
D
max
flue
boiler
reset
reset
max
flue
boiler
reset
reset
D
max
flue
boiler
reset
reset
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
STARTING THE APPLIANCE
Central heating:
1
Set room thermostat to maximum.
Turn the CH thermostat control (D) to max.
on
The burner should be ON with the circulating
service
pump. The diverter valve (E) should open to
lockout
port B for CH.
GREENSTAR HEATSLAVE EXTERNAL
Ensure all radiators are heating up evenly
and balance the system to the temperature
difference required across the heating flow
E
and return relevant to the heating load.
2 Set the room thermostat to minimum.
The burner and circulating pump should be
off. The diverter valve (E) should return to
port A for DHW (default).
Domestic hot water & central heating:
3 Set the room thermostat to maximum.
on
Set the programmer to ON for DHW & CH.
Turn the DHW thermostat control (C) fully
service
anti-clockwise.
lockout
Set the CH thermostat control (D) to max.
GREENSTAR HEATSLAVE EXTERNAL
The burner should be ON with the circulating
pump. The diverter valve (E) should open to
port B for CH.
E
4 Set the DHW thermostat control (C) to max.
The diverter valve (E) should move to port A
and divert the flow to the Heatslave tank.
on
service
lockout
GREENSTAR HEATSLAVE EXTERNAL
E
on
service
lockout
GREENSTAR HEATSLAVE EXTERNAL
E
Open all radiator valves.
Set programmer to ON for CH.
Turn the DHW thermostat control (C) fully
anti-clockwise.
8 716 113 389d (03/2010)

Advertisement

Table of Contents
loading

This manual is also suitable for:

25/3218/25

Table of Contents