8.7 Vacuum Pumping and Leak Detection

1. Use Vacuum Pump
Liquid valve
Gas valve
Refrigerant charging
vent
Nut of refrigerant
Charging vent
2. Leakage Detection
Installation and Maintenance
The water outlet
can't be placed
in water
The water
outlet can't be
fluctuant
Piezometer
Lo
Valve cap
Vacuum pump
Inner hexagon
spanner
Close
Open
8.8 Check after Installation and Test
Operation
1. Check after Installation
installation.
NO.
1
2
3
4
5
Is electric wiring and
6
pipeline installed
7
8
9
10
11
Hi
2. Test Operation
(1) Preparation of test operation
controller to start operation.
emit noise.
water dripping.
water dripping.