OPCOM GrowWall User Manual page 13

Table of Contents

Advertisement

User Manual
Step 9. Tidy up the Tube and Cable
1. Ensure that the tube is connected to the pump, and secured with a tightened
ring fixture. Turn clockwise to tighten.
2. Attach the other end of the tube to the water inlet. Turn clockwise to tighten.
3. Plug the plastic tie into the vertical pipe.
1
Note
These parts were pre-assembled for your convenience; please check that
each item is fastened.
This will also serve as a reference guide; should you disassemble/reassemble
your unit in the future.
GrowWall
P10
2
2.
1.
3

Advertisement

Table of Contents
loading

Table of Contents