Pogo 30 Owner's Manual page 49

Table of Contents

Advertisement

Axxon Composites
D2 adjustment
a. De-jack the mast about 15mm.
b. Hand tightened D2's.
c. Proceed like the on the D1.
Adjustments of the D3, D4 etc
a. Follow the same procedure as the D2.
Final verification
a. Make sure all steps are completed.
b. Double check the final jack pressure matches the recommended numbers. Verify that the
shims fit perfectly (otherwise readjust V1's and D1's turnbuckles).
c. Fasten safety bolts for mast shims and don't forget to use Tef-Gel to avoid corrosion.
d. Check pre-bend of the mast.
e. Verify that the mast is transversally straight.
f.
Check the bearing point of the mast plug on the base is centered about 40% from the
back of the mast.
g. For mast on keel, verify that the tie rods are tight.
h. Verify that the clevis pins and split pins are installed.
i.
Verify that the turnbuckles are locked properly.
j.
Verify that the locking screws of the tipcup are locked with Loctite 270.
k. Verify that the Tef-Gel has been applied properly.
l.
Verify that the stemballs and the turnbuckles are aligned with the ROD.
Figure 6 : Mast step
Page 11 of 15

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Pogo 30

Table of Contents