Step 6: Iid Module Test (Power To The Pilot Valve) - State Water Heaters SBD71120 Service Handbook

Commercial gas high efficiency water heaters series 118 & 119
Hide thumbs Also See for SBD71120:
Table of Contents

Advertisement

STEP 6: IID MODULE TEST (POWER TO THE PILOT VALVE)

CONDITION:
• 24VAC to module, no pilot.
Using a multimeter, test for 24 VAC between terminal PV and 24 V (GND) on the IID during the 90 second
trial for ignition.
IF
The meter does not read 24 VAC and the IID module
is not between ignition trials:
The meter does read 24 VAC:
22
Servicing should only be performed by a Qualified Service Technician
THEN
Replace the module.
Go to Step 7.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbd71120nSbd100390eSbd100390neSbd100390peSbd71120p

Table of Contents