1 9 .HEAT EXCHANGER removal
Screw
Remove the screws. (2 places)
Brazing
point
Remove the EEV COIL. (see chapter 9)
Remove the pipes in the refrigerant - cycle by brazing. (2 places, see chapter 30)
Remove the nuts.
Remove the HEAT EXCHANGER by lifting.
Note at the installation.
When take off Nut, remove packing together.
Tightening torque is from 15.0 to 30.0 N・m.
Panel for fixing the terminal block
Remove the panel for fixing the terminal block
with the terminal block.
Nut
-29-