Section 6
Testing functionality
6.4.9.2
6.5
6.5.1
6.5.1.1
58
equal to 100% of rated power and that the reactive power is equal to 0% of
rated power.
3.
Change the angle between the injected current and voltage to Angle1 + 90°.
Check that the monitored active power is equal to 0% of rated power and that
the reactive power is equal to 100% of rated power.
4.
Change the angle between the injected current and voltage back to Angle1
value. Increase the current slowly from 0 until the START1 signal, start of
stage 1, is activated. Check the injected power and compare it to the set value
Power1, power setting for stage 1 in % of Sbase.
5.
Increase the current to 100% of IBase and switch the current off.
6.
Switch the current on and measure the time for activation of TRIP1, trip of
stage 1.
7.
If a second stage is used, repeat steps

Completing the test

Continue to test another function or end the testing by setting the parameter
TestMode to Off under Main menu/Tests/IED test mode/1:TESTMODE. If
another function is tested, then set the parameter Blocked to No under Main menu/
Tests/Function test modes/Current/GOPPDOP(32,P>)/X:GOPPDOP for the
function, or for each individual function in a chain, to be tested next. Remember to
set the parameter Blocked to Yes, for each individual function that has been tested.

Testing voltage protection functions

Two step undervoltage protection UV2PTUV

Prepare the IED for verification of settings as outlined in
verify
settings".
Values of the logical signals for UV2PTUV are available on the local HMI under
Main menu/Tests/Function status/Voltage/UV2PTUV(27,2U<)/1:UV2PTUV.
The Signal Monitoring in PCM600 shows the same signals that are available on the
local HMI.

Verifying the setting

Verification of START value and time delay to operate for Step1
1.
Check that the IED settings are appropriate, especially the START value, the
definite time delay and the 1 out of 3 operation mode.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the voltage in one of the phases, until the START signal
appears.
4.
Note the operate value and compare it with the set value.
5.
Increase the measured voltage to rated load conditions.
1MRK 504 126-UEN -
2
to
6
for the second stage.
5.1 "Preparing the IED to
Commissioning Manual