(2) Adjustment Procedure
Remove the developer unit, release the cleaning blade, and install the drum jig on the cleaner unit
and set on the copier.
*The jig earth lead must be fixed to the copier frame.
Connecting and Setting the Digital Tester
Setting Range
(-) COM terminal
Connection
(+) Terminal
Drum jig (current measuring jig)
Flow-in measurement connector
MAY.1997 © TOSHIBA CORP.
Transfer
Separation Pre-transfer
DC200mV AC200mV DC200mV
Pin 3 of jig (black cable)
Pin 1 of jig (red cable)
(+)terminal
Digital tester
2-36
Red cable
Earth fixture
(-)COM terminal
Drum jig
Black cable
65/5560 ADJUSTMENT