Venmar 41502 Installation Manual page 8

Avs units constructo 1.0 hrv and constructo 1.0 erv
Hide thumbs Also See for 41502:
Table of Contents

Advertisement

2.
INSTALLATION (
CONT
2.6
I
D
NSTALLING THE
UCTWORK AND
2.6.3 S
I
IMPLIFIED
NSTALLATION
When performing duct connections, always use approved tools and materials. Respect all corresponding laws and/or safety
regulations. Please refer to your local building code.
When performing duct connections to the furnace supply duct, this duct must be sized to support the additional airflow
produced by the HRV/ERV. Also, use a steel duct. For a Return-Return installation, the furnace blower must be in operation
when the HRV/ERV is in operation.
There are 2 methods for connecting the unit to the furnace/air handler:
Method 1: Supply-return connection
S
TEEL DUCT
VJ0037
Stale air intake:
• Cut an opening into the furnace/air handler return duct not less than 10 feet (3.1 m) from the furnace/air handler (A+B).
• Connect this opening to the Exhaust air from building port of the HRV/ERV.
Fresh air distribution:
• Same instructions as for Method 1 or Method 2, Section 2.6.2.
For Method 2 (Return-return), make sure there is a distance of at least 3 feet (0.9 m) between the 2 connections to the furnace/
air handler.
NOTE: For Method 1, it is not essential to synchronize the furnace blower operation with the unit operation, but we recommend it.
If using Method 2, make sure the furnace/air handler blower operation is synchronized with the unit operation! See Section 4.
'
)
D
R
(
'
)
EGISTERS
CONT
D
(
S
1.3)
AS ILLUSTRATED IN
ECTION
M
18"
INIMUM
(0.5
)
M
A
B
A+B=
NOT LESS
10' (3.1
)
THAN
M
!
WARNING
CAUTION
Method 2: Return-return
M
3'
INIMUM
(0.9
)
M
VJ0038
CAUTION
8
A+B=
NOT LESS
A
10' (3.1
)
THAN
M
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

415004150641504

Table of Contents