Before unpacking, visually inspect the shipping carton for evidence of any damage during shipment. It there are signs of
possible damage, do not unpack the equipment Notify the carrier that delivered the shipment so the carton and its contents can
be examined for any damage claims. Fill out all appropriate forms and have the examining carrier sign and date each form. Do
not install damaged equipment.
1. If the shipping carton has no signs of possible damage, unpack the equipment. To rem ove the unit from the carton. it is
easiest to slit the carton in 4 corners and "peel" it away from the steamer. After removing the carton, examine the steamer
for signs of possible damage If damage exists, detail your observations on a claim s form and give to the shipper (keep a
copy for your records).
2. If the equipment is undamaged, lift the unit to the counter top or stand where it is to be installed. Damaged equipment
should not be installed.
Warning: Installation of this unit must be done by qualified plumbing and electrical installation personnel working to all
applicable local and national codes. Improper installation of this product could cause injury or damage and void customer
warranty.

INSTALLATION POLICIES:

• Cleveland/ALCO equipment is designed and manufactured to comply with applicable standards for manufacturers. Included
among those certification agencies which have approved the safety of the equipment design and construction are:
UL NSF, CSA, and others.
• Cleveland/ALCO equipment is designed and certified for safe operation only when permanently installed in accordance with
local and/or national codes. Many local codes exist, and it is the responsibility of the owner and installer to comply with these
codes.
• In no event shall Cleveland/ALCO assume any liability for damage or injury resulting from installations which are not in strict
compliance with our Installation Instructions. Specifically, Cleveland/ALCO will not assume any liability for damage or injury
resulting from improper installation of equipment, including, but not limited to, temporary or mobile installations.

INSTALLATION INSTRUCTIONS FOR ALL MODELS:

WARNING
INSTALLER: ALL SteamPro XVI units MUST BE securely anchored to the floor at all times.
1. These instructions must be retained by the owner/user for future reference. Gas-fired boilers are only to be
installed in noncombustible areas that have provisions for adequate air supply. The term "boiler" will be used
synonymously with "steam generator".
2. Position: For proper operation and drainage, the equipment must be level. It should be placed next to an open floor
drain. DO NOT POSITION THE UNIT DIRECTLY ABOVE THE FLOOR DRAIN. Observe all clearance
requirements to provide air supply for proper operation, as well as sufficient clearance for servicing. The
surrounding area must be free and dear or combustibles. Dimensions and clearance specifications for each model
are shown on the specification sheets enclosed.
3. Install in accordance with local codes and/or the National Electrical Code ANS1/NFPA No. 70-1984. Installation in
Canada must be in accordance with the Canadian Electrical Code CSA Standard C22-1. Equipment that Is
connected to electricity must be grounded by the installer A wiring diagram Is provided inside the base cabinet.
4. Attach drain extension piping to the drain connection to carry steam condensate and boiler drain water away from
the cabinet, to the floor drain. The drain extension piping must be 1 1/2" diameter minimum (ips), and not exceed
6 feet in length, with no more than two elbows, before draining. The drain extension termination MUST vent freely
to the air (not plumbed solidly into the floor drain). Each unit requires its own 1 1/2" diameter drain extension. Do
not interconnect any other drains to this units drain extension. Ensure that the boiler's manual drain valve is
closed.
INSPECTION
UNPACKING

INSTALLATION INSTRUCTIONS

11.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9-pcem-48-l9-pcgm-300-l9-pcdm-l9-pcsm-l9-pcgm-250-l

Table of Contents