Table Of Contents - gledhill TEC140-OV Installation & Servicing Instructions Manual

Torrent eco ov;torrent eco sp;torrent eco sol
Table of Contents

Advertisement

These instructions should be read in conjunction with the installation/servicing
instructions issued by the manufacturer of the heat source being used.
Any installation must be in accordance with the relevant requirements of the Gas
Safety Regulations, Building Regulations, I.E.E. Wiring Regulations and the Water
Fitting Regulations (England and Wales) or Water Byelaws (Scotland). It should be
read in accordance with the relevant recommendations of the following:
BS 6798; BS 5549; BS 5546;
BS 5440:1; BS 5440:2; CP 331:3
BS 6700: BS 5258 and BS 7593: 1993 and BS7671
It must be installed by a competent person as defined by the relevant regulations.
Manufacturers notes must NOT be taken as over-riding statutory obligations.
This product overcomes Part G Building Regulation discharge requirements for
unvented cylinders but the installation is notifiable to building control unless it is
carried out under an approved competent person self-certification scheme.
Although the secondary supply (domestic) is at mains pressure, it is not necessary to
fit an expansion chamber, pressure or temperature relief valve, the plumbing should
allow any unusual build up of pressure to be relieved at the ball valve.
This appliance is not intended for use by persons (including children) with reduced
physical, sensory or mental capabilities, or lack of experience and knowledge unless
they have been given supervision or instruction concerning use of the appliance by
a person responsible for their safety. Children should be supervised at all times to
ensure they do not play with the appliance.
This information is provided to assist generally in the selection of equipment.
Responsibility for selection and specification of our equipment must however remain
that of our customer and any experts or consultants concerned with the installation(s).
PLEASE NOTE: THAT WE DO NOT THEREFORE ACCEPT ANY RESPONSIBILITY FOR
MATTERS OF DESIGN SELECTION OR SPECIFICATION, FOR THE EFFECTIVENESS
OF AN INSTALLATION OR SYSTEM CONTAINING ONE OF OUR PRODUCTS UNLESS
SPECIFICALLY REQUESTED TO DO SO IN WRITING.
All goods are sold subject to our Conditions of Sale which are set out at the rear of this
specification. In the interest of continuously improving the Torrent range, Gledhill
Building Products Limited reserve the right to modify the product without notice, and
in these circumstances this booklet, which is accurate at the time of printing, should
be disregarded. An updated set of Instructions will be produced and supplied with
new appliances and will be made available for other appliances on request.
Benchmark places responsibilities on both manufacturers and installers. The
purpose is to ensure that customers are provided with the correct equipment for
their needs, that it is installed, commissioned and serviced in accordance with the
manufacturers instructions by competent persons and that it meets the requirements
of the appropriate Building Regulations. The Benchmark Checklist can be used to
demonstrate compliance with Building Regulations and should be provided to the
customer for future reference.
Installers are required to carry out installation, commissioning and servicing work
in accordance with the Benchmark Code of Practice which is available from the
Heating and Hot Water Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
For information on the HWA Charter Statement, go to the HWA website hotwater.org.uk.
ISSUE 2: SEPTEMBER 2015
Section
Installation
SERVICING AND MAINTENANCE
Servicing and Maintenance
APPENDIX
Appendix A
Appendix B
BENCHMARK
Page 2
Page
3
6
10
14
27
38
40
41
42
48
49
50
51
52
54
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents