lancer LP2 Superchiller Installation, Operation & Service Manual

lancer LP2 Superchiller Installation, Operation & Service Manual

Advertisement

LP2 Superchiller
230V / 50Hz
Installation, Operation &
Service Manual
lancerbeverage.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LP2 Superchiller and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for lancer LP2 Superchiller

  • Page 1 LP2 Superchiller 230V / 50Hz Installation, Operation & Service Manual lancerbeverage.com...
  • Page 2 LP2 Superchiller 230V / 50Hz This page is intentionally left blank lancerbeverage.com Page 2 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 3: Table Of Contents

    15.  Certificate of Warranty ........................26  16.  Manufacturer’s Checklist ........................27  lancerbeverage.com Page 3 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 4: Introduction

    2. The Company Hoshizaki Lancer is a wholly owned subsidiary of Lancer Corporation, a world leader in the supply of Beverage Dispensing Equipment based in San Antonio, Texas. Lancer has manufacturing bases and distribution networks in 97 countries.
  • Page 5: Specifications

    480 kPa (70psi) – carbonator 4.2 exhaust plumbed to an outside safe area lancerbeverage.com Page 5 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 6: Superchiller Safety Information

    Children should be supervised to ensure that they do not play with the appliance. lancerbeverage.com Page 6 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 7: Service & Maintenance

    If damage exists, have carrier note damage on bill of landing and file a claim with the carrier. lancerbeverage.com Page 7 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 8: Unpacking

    The Superchiller must always be handled in a vertical position. Carefully unpack the Lancer LP2 Superchiller from the shipping carton, remove the wooden base. If appropriate, assemble legs to unit by carefully tilting (tilt should not be more than 45°).
  • Page 9: Connecting To Water Supply

    Page 9 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 10: Plumbing The Drain And Co2 Exhaust

    (where applicable), and syrup pours from each dispenser. lancerbeverage.com Page 10 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 11: Scheduled Maintenance

    Isolate Superchiller from power supply by switching off at socket. lancerbeverage.com Page 11 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 12 Remove sanitising fittings from BIB disconnects and re-connect disconnects to appropriate BIB's. Operate dispensing valves until syrup flows freely. lancerbeverage.com Page 12 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 13: Postmix Circuit Diagram

    LP2 Superchiller 230V / 50Hz 8. Postmix Circuit Diagram lancerbeverage.com Page 13 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 14: Electrical Circuit Diagram

    LP2 Superchiller 230V / 50Hz 9. Electrical Circuit Diagram 9.1. Electrical Circuit Schematic lancerbeverage.com Page 14 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 15: Wiring Diagram

    LP2 Superchiller 230V / 50Hz 9.2. Wiring Diagram lancerbeverage.com Page 15 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 16: Airflow Diagram

    LP2 Superchiller 230V / 50Hz 10. Airflow Diagram lancerbeverage.com Page 16 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 17: Trouble Shooting

    Clean off dust, line, grease, etc. Fan not operating. Remove obstruction or replace motor. lancerbeverage.com Page 17 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 18: Troubleshooting - Postmix

    Carbonator flooded – filled Check mains water pressure - must be lancerbeverage.com Page 18 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 19 21. Replace control or probe if defective. lancerbeverage.com Page 19 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 20: Ranco E37-1201 Icebank Control Go/No Go Test

    (Simulates ice growth over black probe and conductivity between probes 5 & 7 > 85KΩ) lancerbeverage.com Page 20 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 21: Ranco E37-1201 Carbonator Level Control Test

    (i.e. Water level drops below low level probe & resistance between 5 & 7 >85 KΩ) lancerbeverage.com Page 21 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 22: Assembly Diagrams & Parts List

    83607986 AGITATOR SPEED CONTROLLER 82356958 CARBONATOR CONTROL (RANCO E37-1201) lancerbeverage.com Page 22 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 23: Postmix Assembly Diagram

    LP2 Superchiller 230V / 50Hz 14.2. Postmix Assembly Diagram lancerbeverage.com Page 23 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 24: Refrigeration Parts List

    87623487 DRIER 032S SOLID CORE 83600270 HIGH PRESSURE CONTROL lancerbeverage.com Page 24 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 25: Refrigeration Assembly Diagram

    LP2 Superchiller 230V / 50Hz 14.4. Refrigeration Assembly Diagram lancerbeverage.com Page 25 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.
  • Page 26: Certificate Of Warranty

    Lancer will not normally cover any labour costs associated with a warranty claim. Subject to the approval of the Divisional Sales Manager, Lancer may choose to reimburse the customer for some or all labour costs associated with a warranty claim. Any claim for labour costs must be authorized by Lancer prior to the work being undertaken.
  • Page 27: Manufacturer's Checklist

    Copy checklist and file, put manual/checklist in plastic bag with install kit and place in condenser area. W/O ............... Affix label here lancerbeverage.com Page 27 of 27 Hoshizaki Lancer reserve the right to change specifications without notice. No 023b – 12 November 2012 Images are for illustration purposes only as product may vary.

Table of Contents