Panasonic kw9m User Manual page 15

Eco-power meter
Hide thumbs Also See for kw9m:
Table of Contents

Advertisement

◆How to connect CT
(1) Power off the measured devices.
(2) Install applicable CT.
(3) Remove terminal block of KW9M.
(4) Connect CT to the terminal block.
(5) Insert terminal stand surely.
(6) After confirm all wiring correct, turn on the power of the load and KW9M.
(Connection example)
Power supply
Breaker
Primary side current
K
CT with 2nd current 1A/5A
L
Load
◆How to set the parameters for CT
(1) Select CT type (CT-T) according to the using CT.
(Select '5A' if secondary side current of using CT is 5A. Select '1A' if secondary side current
of using CT is 1A.)
(2) Set the primary current of measured CT at primary side current of CT setting mode (CT-1).
< ex > If the measured CT is 400A/1A or 400A/5A, set to"400".
(3) Connect CT according to the CT direction, power side (K) to load side (L).
* Connect CT wiring and terminal block surely.
It will cause CT breakdown.
* Never remove the terminal block under applying current to
load. It will cause electric shock or breakdown CT.
Secondary current
Ammeter etc.
Without Ammeter
K
L
8
KW9M Eco-POWER METER

Advertisement

Table of Contents
loading

Table of Contents