Tab 04: Install, adjust and release
Preassembly
TIP
A rail section with a parking point will be fitted with an extra bracket with a feed-through
opening. The two-core supply cable must also be fed to this.
2.4 Fitting and installing the charging contacts
The charging contact is installed as follows:
1. Strip approximately 9 cm of the supply cable.
2. Attach a faston connector to the cable ends.
3. Feed the cables through the charging contact.
4. Secure the Faston connector on the lips in the charging contact.
5. Fit the charging contact to the rail with (2x) M6x16.
6. Adjust the position of the charging contact so that it is in line with the drive unit spring contact.
Adjustment is always necessary for a vertical start.
Fig. 2-6
Cable feed in charging contact
Fig. 2-8
Mount the charging contact on the rail
8
Flow2 stairlift
1
1
www.ThyssenKruppAccessibility.nl
1
Fig. 2-7
Secure the cables
1
Fig. 2-9
Adjust the charging contact
2007.03.07
Need help?
Do you have a question about the Flow2 and is the answer not in the manual?