Download Print this page

Advertisement

Quick Links

Serious
Steel
887101
LAT OPTION
I I
ASSEMBLY. INSTRUCTIONS "
Pan # 6802501
1
RmA.sion: 3/23/99

Advertisement

loading

Summary of Contents for ParaBody 887101

  • Page 1 Serious Steel 887101 LAT OPTION ASSEMBLY. INSTRUCTIONS " Pan # 6802501 RmA.sion: 3/23/99...
  • Page 2 2. Do not allow minors or children to play on or around this equipment. 3. Exercise with care to avoid injury. 4. If unsure of proper use of equipment, call your local Parabody distributor or call the Parabody customer service department at (800) 328-9714.
  • Page 3: Parts List

    PART# DESCRIPTION 6800203 UPRIGHT ~(X)602 ADJ FOOT SUPPOlZT 6800803 PUI I .h’5[HOUSING 6801003 TOP BOOM 6801102 LAT BAR SUPPORT" ’ 6759802 ~ARRIAGE 6274402 LOW ROW BAR 6725302 LAT BAR’ 3-1/2" PUI 1 Fry 3116201 3116101 4-1/2" PL7 J EY 115-1/4" CABLE 121-3/4"...
  • Page 4 LOWER CROSS SUPPORT FIGURE 2 STEP 2: ¯ NOTE: It may be necessar.~. to loosen the 1/2 X 3-1/4" BOLTS of the LOWER CROSS SUPPORT connecting the UPRIGHT FIL~.ME before beginning STEP 2. ¯ Attach four 314 X 1-1/T’ GLIDES (24) to the inside_ of the tube on the UPRIGHT (1) as sho~ in FIGURE 2 using tI~e follow- ~ng steps: ¯...
  • Page 5 FIGURE STEP 3: ¯ Insert two 2-1/2’ ROUND END CAPS (19) into the ends of the .ADJ. FOOT SUPPORT (2) as shown in FIGURE ¯ Insert one I-3/4" ENiD CAP (20) into the end ofthe ADJ. FOOT SUPPORT (2) as shown in FIGURE ¯...
  • Page 6 FIGURE 4 STEP 4: ¯ Attach eight 1X 1" GLIDES (15) to the ends the CARRIAGE ¯ Thorougltly clean Ml surfaces where the 1 X 1" GLIDES (15) are to be attached. ¯ Remove the 1 X 1" GLIDES (15) from the paper backing and firmly apply" them to all sho~-n surfaces. ¯...
  • Page 7 FIGURE 6 STEP 6: ¯ NOTE: It may be necessary to loosen the 1/2 X 3-1/4" BOLTS of the UPPER CROSS SUPPORT connecting the UPRIGITr FRAME before beginningSTEP 6. ¯ LOOSELY assemble the TOP BOOM (4) to the UPKIGHT (1) using one 1/2 X 4" BOLT (28), one 112 X 3-1/2" BOLT (25), "...
  • Page 8 FIGURE 8 3/8 x STEP 8: ¯ Routethe 115-1/4" CABLE (l l) through the TOP BOOM (4) as sho~vn in FIGURE ¯ SECL’RELY assemble three 3-1/2"" PI]LI EYS (9) into the slots of the TOP BOOM (4) using three 3/8 X 2-3/4" BOLTS (32), six SPACERS (33), and three 3/8"...
  • Page 9 FIGURE 9 STEP 9: ¯ Attach the CABLE (11) from the TOP BOOM (4) to the CARRIAGE (6) using one 1/4" QUICK LINK (36) as shm~al FIG URE 9. (I/~[PORTAN-~. Secure b" lighten QUICKLINK.) ¯ Place one 3-1/2" pLrLLEY (9) into the loop of the CABLE (12) below the second and third PULLEY of the ~FOP BOOM (4) as in FIGURE 9.
  • Page 10 FIGURE 10 STEP 10: Route the threaded end of the 121-3/4" CABLE (12) through the slot oft.he PULLEY HOUSING then SECURELY assemble one 4-1/2 pLrLLEY (10) to the PU~.I.EY HOUSLNG (3) using t~vo 3/8X 2-3/4"" BOLTS (32), two 3/8"" FLANGE SPACERS (.: 3), two 3/8""...
  • Page 11 THREADED END FIGURE STEP 11: Loop the 121-3/4"" CABLE (12) around one 3-1/2" PULLEY ¯ LOOSELY assemble the 3-1/2" PUI JI.EY (9) to the 3/16 X 1-3/4 X 5-1/4" PLATES (30), 3/8" LOCK ¯ SECURELY thrend the end of the 121-3/4" CABLE (12) 3/4 of the way into .into the threaded housing on tile UPRIGHT CURELY tight~j~im ¯...
  • Page 12 ¯ Attach the LOW ROW BAR (7) to the ball end of the lower CABLE (12) using one 12-LINK CHAIN (37) and t~vo 5/16" SNAP (34) as shosx~ i~ FIGURE 12. Thank you for purchasing the Parabody 887101 LAT OPTION~.If unsure ofproper use of equipment, call your local Parabody distributor or call the Parabody customer service department at (800) 328-9714. - ...