Cabinet Disassembly Instructions - FUNAI FL11.3 Service Manual

Table of Contents

Advertisement

CABINET DISASSEMBLY INSTRUCTIONS

1. Disassembly Flowchart
This flowchart indicates the disassembly steps for the
cabinet parts and the CBA in order to gain access to
items to be serviced. When reassembling, follow the
steps in reverse order. Bend, route and dress the
cables as they were.
[1] Stand
Assembly
[3] Digital Main
[2] Rear Cabinet
CBA Unit
[5] Power Supply
[9] Speaker
CBA
[6] Stand Holder
[8] LCD Module
Assembly
[11] Front
Cabinet
2. Disassembly Method
Step/
Fig.
Loc.
Part
No.
No.
Stand
[1]
D1 4(S-1)
Assembly
Rear
[2]
D1 11(S-2), 2(S-3)
Cabinet
4(S-4), 3(S-5), 4(S-6),
Digital Main
D2
CN301, CN302,
[3]
CBA Unit
D3
CN3902, Shield Box,
Jack Holder(D)
3(S-7), (S-8), CL701A,
D2
[4]
Jack CBA
PCB Holder,
D3
Jack Holder(A)
Power
8(S-9), CN101,
D2
[5]
Supply
CN201, CN631,
D3
CBA
CN801, CN802
Stand
[6]
D2 2(S-10), 2(S-11)
Holder
Inverter
D2
6(S-12), CN1201,
[7]
CBA
D3
CN1202, CN1203
LCD
[8]
Module
D2 ---------------
Assembly
4(S-13), Hook,
[9]
Speaker
D2
Speaker Holder(L,R)
[4] Jack CBA
[7] Inverter CBA
[10] Function
CBA
Removal
Note
---
---
---
---
---
---
---
---
---
4-1
Step/
Fig.
Loc.
Part
No.
No.
2(S-14), Shield Plate,
Function
D2
[10]
Sensor LED Lens,
CBA
D3
Function Knob
Front
[11]
D2 ---------------
Cabinet
(1)
(2)
(3)
Note:
(1) Order of steps in procedure. When reassembling,
follow the steps in reverse order. These numbers
are also used as the Identification (location) No. of
parts in figures.
(2) Parts to be removed or installed.
(3) Fig. No. showing procedure of part location
(4) Identification of parts to be removed, unhooked,
unlocked, released, unplugged, unclamped, or
desoldered.
P = Spring, L = Locking Tab, S = Screw,
H = Hex Screw, CN = Connector
e.g. 2(S-2) = two Screws of (S-2),
2(L-2) = two Locking Tabs of (L-2)
(5) Refer to the following "Reference Notes in the
Table."
Removal
Note
---
---
(4)
(5)
FL11.3-A_DC

Advertisement

Table of Contents
loading

Table of Contents