Switching Between Grid Operations And Back-Up Operations - Panasonic LJ-NA02 User Manual

Hide thumbs Also See for LJ-NA02:
Table of Contents

Advertisement

5. Switching between Grid Operations and Back-up Operations
5-1. Switching from Grid Operation to Back-up Operation
• When power fails during a grid operation, the control panel display will change to
up orange and [E020] (Low grid voltage) will appear, indicating power failing. (Other error codes may be displayed
depending upon the system status.)
A blinking power display indicates that the operation mode needs to be switched from grid to back-up.
• Pressing the "ON/OFF (CANCEL)" for one second will stop the operation; and the control panel display will change
to
.
• Pressing the "ON/OFF (CANCEL)" for one second in a stopped state
operation and the control panel display will change to
In operation (Grid-connected)
5-2. Switching from Back-up Operation to Grid Operation
• When the grid becomes normal during back-up operation, the control panel display will change to
Indicator indicating the grid state will light or blink in green and [PF] will disappear.
A blinking power display indicates that the operation mode needs to be switched from back-up to grid.
• Pressing the "ON/OFF (CANCEL)" for one second will stop the back-up operation; and the control panel display will
change to
.
• Pressing the "ON/OFF (CANCEL)" again for one second will start the grid operation; and the control panel display
will change to
.
In operation(Back-up)
.
Stopped (Back-up)
1 sec
Stopped (Grid-connected)
1 sec
. The GRID Indicator will light
will start the back-up operation; and the
In operation (Back-up)
1 sec
In operation (Grid-connected)
1 sec
. The GRID
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lj-sk84a

Table of Contents