3.2.12. P ower Su pply Un it
1. Disconnect cable connect on the Ballast Unit and Safety Swich.
2. Remove two screws(Screw, CC M3x6) fixing the Power Supply Unit, then detach the Power
Supply Unit.
Power Supply Unit
3.2.13. Ba lla st Un it
1. Disconnect cable conect on the Power Supply Unit and Safety Swich.
2. Remove two screws(Screw, CC M3x6) fixing the Ballast Unit, then detach the Ballast Unit.
3. Remove a screw(Screw, CBP-tite M3x8) fixing the RC Receptor Board Assy, then detach
the RC Receptor Board Assy on the Balast Unit.
Revision:A
EMP-9000/8000
Figure3-20
RC receptor board
Figure3-21
3-16
Ballast Unit
Ballast unit
SEIKO EPSON