Room In Which The Dryer Is Located; Securing The Tumble Dryer Against Slippage; Payment System - Miele PT 5135 C OS Operating And Installation Instructions

Hide thumbs Also See for PT 5135 C OS:
Table of Contents

Advertisement

,
Never block the vents on the
dryer.
In order to ensure sufficient
ventilation to the dryer, do not
reduce the vent gap between the
underside of the dryer and the floor
with a plinth, deep-pile carpet, etc.
This tumble dryer is not suitable for
building under.

Room in which the dryer is located

Air taken in for use in the drying
process will be warm when it is
expelled from the underside and back
of the dryer. This expelled air heats up
the air in the room. It is therefore very
important to ensure that the room is
adequately ventilated, particularly if the
dryer is located in a small room.
Otherwise running times and energy
consumption could be increased.
Securing the tumble dryer against
slippage
,
Secure both front feet on the
dryer using the fixing brackets
supplied.
Installation and connection

Payment system

The dryer can be fitted with a payment
system (optional accessory).
This must be connected and
programmed by a Miele Service
technician.
Coins/tokens must be removed from
the payment system regularly,
otherwise it will become blocked.
– Note for service technician:
,
When connecting to a payment
system, the plug connector on the
push button switch (see wiring
diagram) must be disconnected
from its position ex-works and
reconnected to the position for
payment system operation.
Failure to do this can cause the
payment system to malfunction.
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents