Siemens S7-300 Installation Manual page 95

Automation system
Hide thumbs Also See for S7-300:
Table of Contents

Advertisement

7LS
There is a separate opening for test probes up to 2 mm in diameter to the left of the
opening for the screwdriver.
5HTXLUHPHQW
The modules (SM, FM, CP 342-2) are mounted on the rail.
3UHSDULQJ WKH IURQW FRQQHFWRU DQG WKH FDEOHV
:DUQLQJ
You may come into contact with live wires if the power supply module and any
additional load power supply units are connected to the mains.
You should therefore disconnect the S7-300 from the power supply before starting
the wiring. Once you have wired the modules, close all the front panels. You can
then switch on the S7-300 again.
1. Switch off the power supply  .
2. Open the front panel of the module  .
3. Move the front connector into wiring position  .
Slide the front connector into the signal module until it latches. The front
connector still protrudes from the module in this position.
Advantage of the wiring position: Easy wiring.
In this wiring position the front connector does not contact the module.
4. Strip the leads to a length of 6 mm.
5. Crimp on the cable end sleeves, e.g. for terminating 2 conductors on 1 terminal.
S7-300 Automation System, Hardware and Installation: CPU 312IFM - 318-2 DP
A5E00203919-01
:LULQJ
7-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents