Siemens S7-300 Installation Manual page 103

Automation system
Hide thumbs Also See for S7-300:
Table of Contents

Advertisement


:LULQJ WKH %XV &RQQHFWRU
,QWURGXFWLRQ
You need to network the nodes if you want to create a multiple-node subnet. The
components you require here are listed in the Chapter &RQILJXULQJ &RQILJXULQJ D
6XEQHW.
Information on how to wire the bus connector can be found in the article below.
:LULQJ WKH EXV FDEOH WR WKH EXV FRQQHFWRU
%XV FRQQHFWRU ZLWK VFUHZ WHUPLQDOV
1. Strip the bus cable.
Details on stripped lengths are found in the product information included with
the bus connector.
2. Open the bus connector housing.
3. Insert the green and the red wire into the screw-terminal block.
Note that you always have to connect the same wires to the same terminal (e.g.
always wire green to terminal A and red to terminal B).
4. Press the cable sheath into the clamp. Take care that the bare shielding
contacts the shielding contact surface.
5. Screw-tighten the wire terminals.
6. Close the bus connector housing.
)DVW &RQQHFW EXV FRQQHFWRU
1. Strip the bus cable.
Details on stripped lengths are found in the product information included with
the bus connector.
2. Open the strain relief of the bus connector.
3. Insert the green and red wire into the open contacting covers.
Note that you always have to connect the same wires to the same terminal (e.g.
always wire green to terminal A and red to terminal B).
4. Close the contacting cover.
This presses the wires down into the insulation displacement terminals .
5. Screw-tighten the strain relief clamp. Take care that the bare shielding contacts
the shielding contact surface.
S7-300 Automation System, Hardware and Installation: CPU 312IFM - 318-2 DP
A5E00203919-01
:LULQJ
7-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents