Tie Tape Repair Procedure; Coax Splice Preparation - Bell OH-58A Technical Manual

Table of Contents

Advertisement

Figure 11-25.

Tie Tape Repair Procedure

4.
Record BDAR action taken.
mission is complete, as soon as
practical, repair the equipment/system
using standard maintenance procedures.
NOTE
Harness branches can be secured
by tying.
OPTION 3: String or Wire Repair.
LIMITATIONS: This is a temporary
repair.
PERSONNEL/TIME REQUIRED:
1 Soldier
1 Minute
MATERIALS/TOOLS
REQUIRED:
Wire or String
PROCEDURAL STEPS:
Tie wires or groups using type knot
1.
shown in Figure 11-25.
Do not tighten wire or string too
much, as wire or string can cut
into or deform insulation.
2.
Space ties at 12 inches or less.
3.
Record BDAR action taken.
mission is complete, as soon as
practical, repair the equipment/system
using standard maintenance procedures.
11-15.
RG-179B/U.
GENERAL INFORMATION:
coax splices in the wiring repair kit
that may be used for the different types
and sizes of coax cable.
LIMITATIONS: This is a temporary
repair.
When
PERSONNEL/TIME
1 Soldier
15 Minutes
MATERIALS/TOOLS
Coax Splice (item 10, Appx B)
Stripper or Knife
Crimp Tool, AD-1377 (item 10, Appx B)
Reflector (item 10, Appx B)
Heat Gun/Heat Source (item 10, Appx B)
PROCEDURAL STEPS:
1.
Prepare coax cable, Figure 11-26.
Refer to Table 11-5.
Figure 11-26. Coax Splice Preparation
TM 55-1520-228-BD
ELECTRICAL AND AVIONICS SYSTEM
CAUTION
COAX SPLICE FOR RG-136/U AND
There are various
REQUIRED:
REQUIRED:
When
11-29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oh-58 c

Table of Contents